My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2010_2011 ANNUAL MONITORING REPORT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SIXTH
>
720
>
2900 - Site Mitigation Program
>
PR0009049
>
ARCHIVED REPORTS_2010_2011 ANNUAL MONITORING REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 4:14:49 PM
Creation date
5/13/2020 1:33:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2010_2011 ANNUAL MONITORING REPORT
RECORD_ID
PR0009049
PE
2960
FACILITY_ID
FA0004041
FACILITY_NAME
UP TRACY RAIL YARD
STREET_NUMBER
720
Direction
E
STREET_NAME
SIXTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
25001014
CURRENT_STATUS
01
SITE_LOCATION
720 E SIXTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
844
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARCADIS 2010/2011 Annual <br /> ' Monitoring Report <br /> Union Pacific Railroad <br /> ' Company <br /> Tracy, CA- Maintenance <br /> 1.0 Introduction Facility <br /> ' ARCADIS U.S., Inc. (ARCADIS) has prepared this monitoring report on behalf of the <br /> Union Pacific Railroad Company(UPRR)regarding the UPRR former Maintenance <br /> ' Facility located at 720 East Sixth Street in Tracy, San Joaquin County, California(the <br /> Site; Figures 1 and 2)for submittal to the California Regional Water Quality Control <br /> Board, Central Valley Region(RWQCB). . <br /> ' Sampling activities were conducted in accordance with Monitoring and Reporting Order <br /> (MRO) Number R5-2002-0807 and the Draft MRO dated February 11,2009(RWQCB <br /> 2009). This report provides a summary of groundwater monitoring and sampling <br /> ' activities conducted at the site between April 1, 2010 and March 31, 2011 (2010/2011 <br /> reporting period). <br /> ' 2.0 Groundwater Sampling <br /> Quarterly groundwater sampling of new wells(MW-23A through MW-27A)was <br /> conducted on June 21 and September 23, 2010. Semiannual groundwater sampling <br /> was conducted on November 22 and 23, 2010. A annual groundwater sampling was <br /> conducted during March 16 through 18,2011. Groundwater samples were collected <br /> ' from wells as outlined below: <br /> • Quarterly—(five wells)newly installed wells MW-23A, MW-24A, MW-25A, MW- <br /> 26A, and MW-27A <br /> ' • Semiannually— (six wells) MW-02A, MW-09A, MW-10A, MW-22A, TW-03, and <br /> TW-04 <br /> ' • Annually— (23 wells) MW-01A, MW-01 B, MW-01 C, MW-028, MW-04A through <br /> MW-08A, and MW-10B through MW-16B <br /> Wells TW-04, MW-06A, MW-08A, and MW-11A were not sampled during the <br /> ' November 2010 or the March 2011 monitoring events because free product was <br /> present in these wells. Presence of free product in this area is consistent with historical <br /> observations. <br /> 3.0 Sampling Procedures <br /> ' Groundwater monitoring and sampling activities were conducted by Blaine Tech <br /> Services, Inc. (Blaine Tech). Prior to conducting groundwater sampling, depth to <br /> groundwater(or product if present)was measured to the nearest 0.01 foot in the <br /> ' fiel_Irecy. amnt feorty_AnnRpl_4Z6.2a11 dac Page: 117 <br />
The URL can be used to link to this page
Your browser does not support the video tag.