Laserfiche WebLink
ARCADIS Mr. Eric Rapport <br /> April 21, 2011 <br /> If you have any questions or comments regarding the contents of this report, please <br /> contact James Eisert of ARCADIS by telephone at (916) 786-1871 or by e-mail at <br /> James.Eisert@arcadis-us.com. <br /> Sincerely, <br /> ARCADIS U.S., Inc. <br /> James E. Eisert, PG, CHG <br /> Principal Hydrogeologist <br /> Senior Project Manager <br /> CA PG No. 7000, CA CHG No. 779 <br /> Attachments: <br /> Table 1 Well Construction Details <br /> Table 2 Summary of Groundwater Elevations <br /> Table 3 Groundwater Analytical Data Summary <br /> Table 4 Historical Groundwater General Chemistry Analytical Data Summary <br /> Table 5 Surface Water Analytical Data Summary <br /> Table 6 Historical Surface Water General Chemistry Analytical Data Summary <br /> Table 7 Soil Gas Readings <br /> Table 8 Historical Soil Gas Analytical Results <br /> Table 9 Dissolved Oxygen Concentrations <br /> Table 10 Oxidation-Reduction Potential Concentrations <br /> Table 11 Slope Stake Monitoring Measurements <br /> Table 12 Slope Monitoring Measurements <br /> Figure 1 Vicinity Map <br /> Figure 2 Site Map <br /> Figure 3 Alluvial Zone Potentiometric Surface Elevation Map— First Quarter 2011 <br /> Figure 4 Bedrock Zone Potentiometric Surface Elevation Map— First Quarter 2011 <br /> Figure 5 Benzene and Ethanol Concentrations in Alluvial Wells— First Quarter 2011 <br /> Figure 6 Benzene and Ethanol Concentrations in Bedrock Wells— First Quarter <br /> 2011 <br /> Figure 7 River Sample and Test Pit Locations <br /> Attachment 1 Field Data Sheets (on CD) <br /> Attachment 2 Certified Laboratory Analytical Reports (on CD) <br /> Attachment 3 Historical Biosparge System Layout and Operation Data (on CD) <br /> 1\Arcadis-us\officedatalFolsom-CA\Aproject\UPRR\RC000738-UP RR-StorrieTeliverables\QuarterlyReports120111Q1-2011VIinaltedlQ-2011StorrieStatus Rpt(4-21- Page: <br /> 11).doc 8/9 <br />