My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SAVANNA
>
0
>
2900 - Site Mitigation Program
>
PR0092671
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 2:36:12 PM
Creation date
5/13/2020 1:56:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0092671
PE
2950
FACILITY_ID
FA0004087
FACILITY_NAME
HARVEST GLEN PARK
STREET_NUMBER
0
STREET_NAME
SAVANNA
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
244-080-578
CURRENT_STATUS
02
SITE_LOCATION
SAVANNA DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k" KLEINi ELDER <br /> 2 BACKGROUND <br /> The Jonathan Group retained Kleinfelder to perform a PSA of three parcelsk(APN 127-67- <br /> 56, 237-12-35, and 237-12-43) totalling 92.5 acres, to be known as the Harvest Glen <br /> Subdivision. The subject site is located in the southwest corner of Tracy Boulevard and <br /> Valpico Road in Tracy, California. A site location map is included as Plate 1 in Appendix <br /> B. <br /> Kleinfelder's PSA report dated June 27, 1988, showed no indication of onsite <br /> contamination; however, two sites near Harvest Glen Subdivision, Georgia-Pacific (east of <br /> the site) and.Triple-E (east of the site), are under investigation by the RWQCB for <br /> chloroform contamination of the ground water. <br /> The Jonathan Group retained Kleinfelder to install three ground water monitoring wells <br /> onsite to assess a baseline ground water yquality beneath the site. A Work Plan (dated <br /> August 25, 1988) was prepared and the work was implemented from November 14 to <br /> November 29, 1988. The following report describes the work performed and presents the <br /> analytical results. <br /> 1 <br /> 156-A8-2362 2 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.