My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SEQUOIA
>
500
>
2900 - Site Mitigation Program
>
PR0505768
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 9:40:24 AM
Creation date
5/13/2020 2:04:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505768
PE
2960
FACILITY_ID
FA0006988
FACILITY_NAME
ALDEN PARK CHEVRON
STREET_NUMBER
500
Direction
N
STREET_NAME
SEQUOIA
STREET_TYPE
AVE
City
TRACY
Zip
95376
APN
23416001
CURRENT_STATUS
01
SITE_LOCATION
500 N SEQUOIA AVE
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\fgarciaruiz
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
462
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.TATE OF CALIFORNIA .� GEORGE DEUKMEJIAN,Governor <br /> ALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD— , <br /> f ENTRAL VALLEY REGION <br /> 3 ROUTIER ROAD <br /> OCRAMENTO.CA 95827-3098 <br /> 3�L5� 7 <br /> 1 <br /> 20 March 1987 <br /> ' Mr. Steve Woodruff <br /> Chevron Pipe Line Company <br /> 555 Market Street <br /> ' San Francisco, CA 94120 <br /> ALDEN -PARK, SAN JOAQUIN COUNTY <br /> ' I have reviewed the "Field Investigation for Phase II Site Assessment" work plan <br /> for the subject site. Since the objective of the work plan is to locate the <br /> ' suspected subsurface, concrete, slab beneath Alden Park and evaluate <br /> contamination of local soils and ground water resulting from the slab's history, <br /> we, for the most part, agree with the proposals presented in the work plan. <br /> ' There are some changes that must be made before our full approval of the plan <br /> can be given. We do not foresee these changes holding up initial progress of <br /> the work plan. If appropriate changes are agreed upon, the entire work plan may <br /> ' proceed close to the time table you have indicated. <br /> As was agreed upon at our 20 January 1987 meeting, the residential soil sampling <br /> ' described in the work plan was to begin prior to submittal of the subject work <br /> plan. I understand as of 9 March 1987 this task was nearing completion. <br /> So that work may continue uninterrupted, we will allow the probing for the <br /> ' concrete slab to begin, if, as agreed during our phone conversation of 16 March <br /> 1987, the slabs elevation and slope relative to the ground elevations are <br /> surveyed and documented while probing. <br /> ' Verification of the Polynuclear Aromatics (PNAs) and volatile organics detected <br /> In earlier soil samples (see Kennedy/Jenks/Chitton October 1986 report) has not <br /> been addressed in the subject work plan. As we discussed at our 20 January 1987 <br /> ' meeting, additional soil samples should be collected from Alden Park to <br /> determine if the presence of PNAs detected at boring B-11H is confined to the <br /> sampled area, or is more extensive. Samples should also be collected from areas <br /> ' where methylene chloride and chloroform were detected to confirm their presence <br /> In soil , and that they were not introduced from laboratory sources. If the <br /> presence of these chemicals is confirmed, their extent should be defined by <br /> additional soil sampling. This soil sampling may be implemented immediately, as <br /> long as local requirements are adhered to. The results of the soil samples <br /> should be surrmarized in the Final Report. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.