My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SEQUOIA
>
500
>
2900 - Site Mitigation Program
>
PR0505768
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 9:40:24 AM
Creation date
5/13/2020 2:04:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505768
PE
2960
FACILITY_ID
FA0006988
FACILITY_NAME
ALDEN PARK CHEVRON
STREET_NUMBER
500
Direction
N
STREET_NAME
SEQUOIA
STREET_TYPE
AVE
City
TRACY
Zip
95376
APN
23416001
CURRENT_STATUS
01
SITE_LOCATION
500 N SEQUOIA AVE
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\fgarciaruiz
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
462
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
geologist gist or engineer. Soil samples will be obtained from depths of 2 feet, 4 <br /> feet and 8 feet, and extruded in the field to containers for shipment to the <br /> R <br /> ? testing laboratory. Upon collection, each sample would be monitored by an <br /> Organic Vapor Analyzer (OVA) to provide additional data concerning the vertical <br /> distribution of organic species. <br /> ' All one inch diameter holes created during the day will be backfilled to the <br /> q� <br /> ground surface using a cement/bentonite mixture. Although this will require <br /> entering each property twice during the day, it is the most effective way to <br /> assure that all test holes are properly sealed. <br /> Chemical Analysis <br /> 5 <br /> All soil samples will be properly labeled, stored in appropriate containers <br /> 9 <br /> E� and transported to our laboratory subcontractor, ANATEC Laboratories, Inc. of <br /> Santa Rosa for testing. Oil and grease content will be obtained for each <br /> individual sample and presented in our summary report. Chain-of-custody proce- <br /> dure will be followed. <br /> Demobilization <br /> At the completion of the work, the site will be cleared of all. equipment , <br /> j tools , disposable supplies and material which may have accumulated during per- <br /> formance of the work. <br /> Because of the sensitive nature of the project, we will endeavor to perform <br /> r� all work in a manner which minimizes disruption of local activities and will <br /> consistently be sensitive to maintaining the goodwill of the local residents. <br /> 'r SCHEDULE <br /> We will begin work immediately upon approval of this work plan by Chevron <br /> Pipe Line Company and the RWQCB. The residential oil and grease sampling will <br /> begin upon receipt of permission from each affected homeowner. We expect the <br /> scope of work as described in this Work plan to be completed within 4-6 weeks of <br /> z, start-up. If additional field work is required, this schedule will be extended. <br /> Chemical analysis results will be available within a month of sample submittal. <br /> 3ED2/H -14- <br /> s, <br />
The URL can be used to link to this page
Your browser does not support the video tag.