My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SEQUOIA
>
500
>
2900 - Site Mitigation Program
>
PR0505768
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 9:40:24 AM
Creation date
5/13/2020 2:04:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505768
PE
2960
FACILITY_ID
FA0006988
FACILITY_NAME
ALDEN PARK CHEVRON
STREET_NUMBER
500
Direction
N
STREET_NAME
SEQUOIA
STREET_TYPE
AVE
City
TRACY
Zip
95376
APN
23416001
CURRENT_STATUS
01
SITE_LOCATION
500 N SEQUOIA AVE
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\fgarciaruiz
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
462
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S <br /> 5. Be responsible for identifying all WMS site personnel with <br /> special medical problems. <br /> 3.4 PROJECT PERSONNEL <br /> Project personnel involved in onsite investigations and <br /> operations are responsible for: <br /> 1 . Taking all reasonable precautions to prevent injury <br /> to themselves and to their fellow employees; and <br /> tr <br /> 2. Performing only those. tasks that they believe they <br /> can do safely, and immediately reporting any acci- <br /> dents and/or unsafe conditions to the SSD or PM. <br /> x <br /> 3. Implementing the procedures set forth in the Health <br /> and Safety Plan, and reporting any deviations from <br /> the procedures described in the Plan to the SSO or <br /> PM for action. <br /> 4. Notifying the PM and 5SD of any special medical problems <br /> (i .e. , allergies) and insuring that all on-site <br /> r <br /> personnel are aware of any such problems. <br /> 4.0 BACKGROUND <br /> 4. 1 SITE HISTORY <br /> � The area now occupied by Alden Pari: (Plate 1 ) was formerly <br /> x the site of an oil storage reservoir facility. The reservoir <br /> facility consisted of a concrete-lined 550 foot (approximate) <br /> .� diameter circular oil storage reservoir surrounded by an <br /> earthen firewall . An oil pumping station, owned by Tidewater <br /> - Oil Company, was located northeast of the facility and was <br /> connected to the oil storage reservoir by pipelines. Subse- <br /> quent to demolition of the oil storagte facility in the early <br /> 1960 's, and prior to the area 's development into a residential <br /> neighborhood in the late 1970'x, the area was utilized for agri- <br /> cultural purposes. <br /> ` A subsurface investigation undertaken by J.H. Kleinfelder and <br /> Associates in 1972 found concrete underneath much of the Alden <br /> e� Park site. Soils containing visible indications of oil were <br /> noted on all but two of Kleinfelder 's boring logs. <br /> In Spring of 1966, concrete and subsurface oil were uncovered <br /> by a homeowner adjacent to the eastern perimeter 'of Alden Parr. <br /> E� 4.2 `DAMES & MODRE ACTIVITY <br /> Dames & Moore will be conducting a site investigation to locate <br /> the buried concrete slab and to define the extent of 'soil and <br /> groundwater contamination by oil . Activities will include: <br /> collection of soil samples using hand power sampling equipment , <br /> excavation of backhoe pits; drilling and sampling of soil borings, <br /> well installations and groundwater sample collection. <br /> 9 <br /> 6 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.