My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SEQUOIA
>
500
>
2900 - Site Mitigation Program
>
PR0505768
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2026 12:31:35 PM
Creation date
5/13/2020 2:07:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505768
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0006988
FACILITY_NAME
ALDEN PARK CHEVRON
STREET_NUMBER
500
Direction
N
STREET_NAME
SEQUOIA
STREET_TYPE
AVE
City
TRACY
Zip
95376
APN
23416001
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
500 N SEQUOIA AVE TRACY 95376
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wong,Jeff <br /> From: Moniz, Robert <Robert.Moniz@arcadis.com> <br /> Sent: Tuesday, March 17, 2020 4:15 PM <br /> To: Hitz, Brian D.@Waterboards;Wong,Jeff <br /> Cc: Just, Allen; Oliphant, Michael N <br /> Subject: Re: Chevron Alden Park - Work Plan Addendum Memo <br /> Team: <br /> To clarify, Arcadis will overdrill the three wells to total depth and remove all well-related materials. The hole <br /> will be grouted with neat cement (tremie grouted if water is found) to just below ground surface - leaving room <br /> for sidewalk and associated sub-base, or top soil - to match the surrounding surface completion. <br /> Apologies for any confusion. <br /> -Rob <br /> M: 925.788.7377 <br /> From: Moniz, Robert <br /> Sent:Thursday, March 12, 2020 2:28:05 PM <br /> To: Hitz, Brian D.@Waterboards<Brian.Hitz@Waterboards.ca.gov>; Wong,Jeff<Jwong@sjgov.org> <br /> Cc:Just, Allen <AIIen.Just@arcadis.com>; Oliphant, Michael N <Mike.oliphant@chevron.com> <br /> Subject: Chevron Alden Park-Work Plan Addendum Memo <br /> Hi Brian and Jeff. <br /> Thanks for the patience while we worked through the permitting process with San Joaquin County Environmental Health <br /> Department. <br /> To get final approval for the well abandonment permits,Jeff asked for a simple memo explaining that we would not <br /> pressure grout the casings as stated in the Well Abandonment Work Plan (Work Plan), but would instead overdrill all <br /> installed materials. <br /> Please find the attached memo stating this change in procedure, which we also submit as an addendum to the Work <br /> Plan previously submitted to and accepted by the Central Valley Regional Water Quality Control Board. <br /> Assuming this allows us to receive the well abandonment permits in the next week, we will keep our tentative date for <br /> overdrilling on March 191n <br /> -Rob <br /> Rob Moniz I Project Geologist I robert.moniz(cD-arcadis.com <br /> Arcadis <br /> 2300 Clayton Road, Suite 400 <br /> Concord, CA 94520 <br /> T: 925.296.7839 1 M: 925.788.7377 <br /> Connect with us! www.arcadis.com I Linkedln I Twitter I Facebook <br /> EXPLOREArcadis <br /> DOW14LOAD OUR MORILE APP Co ECT <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.