My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SHAW
>
1265
>
2900 - Site Mitigation Program
>
PR0506292
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2020 1:01:08 PM
Creation date
5/13/2020 2:42:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506292
PE
2950
FACILITY_ID
FA0007328
FACILITY_NAME
EMPTY LOT
STREET_NUMBER
1265
Direction
N
STREET_NAME
SHAW
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
14327041
CURRENT_STATUS
02
SITE_LOCATION
1265 N SHAW RD
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a .. <br /> File No. 20-3937-01 <br /> June 21, 1996 <br /> PROJECT TIME SCHEDULE <br /> Upon receipt of our signed contract,the estimated time schedule will be as follows: <br /> STANDARD ANALYTICAL TURN-AROUND TIME <br /> Approximate Time Task <br /> Week 0 Notification of proposal acceptance in writing (signed contract) <br /> Week 0 -4 Task E01 - Permitting* and pre-field activities <br /> Week 4 - 5 Task E02 - Drilling of three soil borings and monitoring well <br /> installation <br /> Week 5 - 6 Task E03 - Monitoring well development and sampling <br /> Week 6 - 8 Chemical Analysis** <br /> Week 8 - 9 Task E05 -Reporting <br /> Week 4 - 8 Task E04 - Soil Sampling for Asbestos <br /> * Kleinfelder has no control over permitting review time by regulatory agencies <br /> involved with the project. It is possible that delays could occur; however, <br /> Kleinfelder will make every effort to expedite the process. <br /> ** Kleinfelder has no control over chemical analysis involved with the project. It <br /> is possible that delays could occur; however, Kleinfelder will make every effort <br /> to expedite the process. <br /> 20-3937-01/MP960068 Page 8 of 10 01996, Kleinfelder, Inc. <br /> KLEINFELDER 2825 East Myrtle Street, Stockton,CA 95205-4794 (209)948-1345 (209)948-0621 fax <br />
The URL can be used to link to this page
Your browser does not support the video tag.