Laserfiche WebLink
Temporary Well Installation and Groundwater Sampling <br /> SURFACE <br /> Depth to 7STEELIVE CASING <br /> Water <br /> Figure 1 <br /> III <br /> III WELL SCREEN: 0.020" <br /> III MACHINE SLOTTED <br /> 3, STAINLESS STEEL <br /> END CAP <br /> LEFT IN PLACE <br /> Groundwater samples are collected by removing the inner rod and attaching a 4-foot stainless steel screen with a <br /> drive point at the end(Figure 1). The screen and rod are then inserted in the outer barrel and driven to the desired <br /> depth where the outer rod is retracted to expose the screen. if enough water for sampling is not produced through the <br /> stainless well screen, a 1-inch PVC screen can be installed in the boring and the outer rod retracted to leave a <br /> temporary well point for collecting groundwater samples or water levels. <br /> Monitoring Well Installation and Development <br /> Permanent small-diameter monitoring wells are installed by driving the outer barrel and inner rod as described <br /> above. Upon reaching the desired depth the system is removed and 2-inch OD(1/2-inch ID)pre-packed PVC piping <br /> is installed. The well plug is created using granular bentonite. The well seal is constructed of cement and sealed at <br /> the surface with a conventional"Christy®Box"or similar vault. Monitoring wells are developed by surging the well <br /> with a small diameter bailer and removing 3 to 5 casing volumes of water until the produced water is clear. <br /> Groundwater Sample Collection and Water Level Measurement <br /> Prior to collecting groundwater from the wells the water l:vels are measured in all wells using an electronic water <br /> level gauge. Monitoring wells are prepared for sampling by purging three well bore volumes of water. Water is <br /> removed using small diameter bailers,a peristaltic pump,or manually using tubing with a check valve at the bottom. <br /> During removal of each volume, the temperature, pH and conductivity are measured and recorded on the field <br /> sampling form. Successive well volumes are removed until the parameters have stabilized or the well has gone dry. <br /> Prior to sampling,the well is allowed to recover to within 90%of the stabilized water levels. <br /> Groundwater samples are collected using small diameter bailers. The samples are decanted into laboratory supplied <br /> containers, labeled,recorded on a chain-of-custody form and placed on ice for transport to a certified laboratory. <br /> 1 Small diameter wells often produce small sample quantities and are appropriate for analysis of volatile and aromatic compounds and dissolved metals analysis using <br /> VOA vials. Obtaining liter-size samples can be difficult and time consuming. Monitoring wells installed by the direct push method are most effective at sites where the <br /> subsurface soils are more coarse than silt,gasoline components are the key contaminants of concern,and water levels are not more than 25 feet below ground surface. <br /> CLEARwATER GROUP(DIRECT PUSH) 2 revised October 5,2002 <br />