My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
2122
>
2900 - Site Mitigation Program
>
PR0544211
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 4:30:17 PM
Creation date
5/13/2020 4:00:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0544211
PE
2960
FACILITY_ID
FA0025128
FACILITY_NAME
RALPH'S SQUARE - BUI
STREET_NUMBER
2122
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16916201
CURRENT_STATUS
01
SITE_LOCATION
2122 S AIRPORT WAY
P_LOCATION
01
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Offsite Assessment Work Plan <br /> RALPH'S SQUARE <br /> 2122 South Airport Way, Stockton, California <br /> SECTION PAGE <br /> 1.0. INTRODUCTION................................................................................................... 1 <br /> 2.0. SCOPE OF WORK ............................................................................................... 1 <br /> 2.1 . PRE-FIELD WORK ACTIVITIES ....................................................................... 1 <br /> 2.2. MONITORING WELL INSTALLATION .............................................................. 2 <br /> 2.2.1 . Well Development and Survey....................................................................2 <br /> 2.2.2. Groundwater Sampling and Analysis........................................................... 2 <br /> 2.3. REPORT PREPARATION ................................................................................. 3 <br /> 3.0. FIELD PROCEDURES..........................................................................................3 <br /> 3.1 . MONITORING WELL INSTALLATION .............................................................. 3 <br /> 3.2. WELL COMPLETION ........................................................................................ 3 <br /> 3.3. WELL DEVELOPMENT AND SURVEY.............................................................4 <br /> 3.4. GROUNDWATER SAMPLING PROCEDURES ................................................4 <br /> 3.5. EQUIPMENT DECONTAMINATION/WASTE MANAGEMENT .........................4 <br /> FIGURES <br /> Figure 1 — Location Map <br /> Figure 2 — Site Plan <br /> Figure 3 — Proposed Monitoring Well Locations <br /> Figure 4 — Shallow Monitoring Well Design <br /> TABLES <br /> Table 1 — Groundwater Elevation Data <br /> Table 2 — Analytical Results of Groundwater Samples <br /> APPENDICES <br /> Appendix A — Regulatory Correspondence <br /> Appendix B — Monitoring and Sampling Procedures <br />
The URL can be used to link to this page
Your browser does not support the video tag.