My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
5000
>
2900 - Site Mitigation Program
>
PR0545265
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 4:40:57 PM
Creation date
5/13/2020 4:01:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0545265
PE
2950
FACILITY_ID
FA0025736
FACILITY_NAME
SCK TAXIWAY D REBAB
STREET_NUMBER
5000
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
5000 S AIRPORT WAY
P_LOCATION
01
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Health and Safety Plan <br /> ENSAFE RS&H <br /> Stockton Metropolitan Airport, Stockton, California <br /> January 27, 2020 <br /> • Monitors the"work parties" for signs of stress, such as cold exposure, heat stress, and fatigue <br /> • Monitors onsite hazards and conditions <br /> • Participates in the preparation of and the implementation of the HASP <br /> • Conducts periodic inspections (minimum—weekly) to determine if the HASP is being followed <br /> • Ensures that all required safety equipment is available <br /> • Advises site personnel of potential chemical exposures and consequences <br /> • Is aware of plant emergency procedures, evacuation routes, and the telephone numbers of <br /> the ambulance service, local hospital, poison control center, fire department, and <br /> police department <br /> • Notifies, when necessary, local emergency officials <br /> • Coordinates emergency medical care <br /> • Orders a cease of work activities if required for any emergency situation <br /> -.4 Field Crew Members <br /> Depending on the size of the field team, any or all of the field team may be in the "work party," but <br /> the "work party" shall consist of at least two people. The field team members may consist of <br /> equipment operators, sampling technicians, environmental technicians, etc. The field crew <br /> responsibilities include the following: <br /> • Safely completes the onsite tasks required to fulfill work plan <br /> • Complies with the HASP <br /> • Notifies SSHO or Project Manager of any unsafe conditions <br /> 5.5 Contractors or Subcontractors <br /> Subcontractors hired for this project are included in the following table: <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.