Laserfiche WebLink
i <br /> Site Background Information Mel Bokides Petroleum - Linden <br /> Page 3 of 5 <br /> 60 feet bsg Soil samples were collected at five foot intervals, generally beginning at 10 feet bsg, or <br /> where native soil was encountered below back fill <br /> A total of 28 soil samples were analyzed Samples from B6'had concentrations of BTEX compounds <br /> and MTBE above laboratory reporting limits MTBE ranged from 0 010 milligrams per kilogram <br /> (mg/kg)to 0 63 mg/kg Maximum concentrations of BTEX compounds were 0 020 mg/kg benzene, <br /> 0 060 mg/kg toluene, 0 030 mg/kg ethylbenzene and 0 070 mg/kg xylenes The sample results from <br /> B7 showed only one contaminated sample, at 30 feet, with 0 49 mg/kg MTBE Samples from MW- <br /> 1 R had 12 mg/kg TPH-g at 40 feet, MTBE was detected at concentrations of 0 43 mg/kg and 12 <br /> mg/kg at 30 and 40 feet, respectively, TAME was detected at 30 and 40 feet, at concentrations of <br /> 0 040 mg/kg and 0 030 mg/kg, respectively <br /> Results from V W 1 A showed TPH-g and TAME at 40 feet with concentrations of 4 6 mg/kg and <br /> I0 010mg/kg,respectively MTBE was detected from 40 to 60 feet,ranging from 0 030 mg/kg to 4 2 <br /> mg/kg Soil from VW3 had MTBE at 30 and 40 feet with concentrations of 0 020 mg/kg and 0 060 <br /> Img/kg, respectively <br /> Monitoring and vapor extraction wells were completed within the following intervals MW-l R from <br /> . 80 feet to 100 feet bsg,VW 1 B from 15 feet to 40 feet bsg,V W 1 A from 40 feet to 70 feet bsg,V W2 <br /> from 15 feet to 40 feet bsg, VW3 from 20 feet to 50 feet bsg <br /> I MTBE was detected in the ground water sample collected from well MW-1 at a concentration of <br /> 120 µg/1 <br /> SVE REMEDIATION FEASIBILITY PROCEDURES <br /> I Two separate soil vapor extraction pilot tests were conducted on 18 September 2003 and 06 October <br /> 2003 On 18 September 2003, the upper sand layer was tested using vapor well VW1B, screened <br /> from 15 feet bsg to 40 feet bsg, as the extraction well On 06 October 2003, a second pilot test was <br /> conducted on the fine-grained deeper impacted areas closest to ground water at the site using vapor <br /> well VW1A, screened from 40 feet bsg to 70 feet bsg as the extraction well The pilot tests were <br /> initiated at 8 00 am and continued for 8 hours A total of four soil vapor samples were collected <br /> Iduring each pilot test <br /> Analytical results of soil vapor samples were generally highest in the second sample collected on 18 <br /> September Extraction well V W 1 B results indicated TPH-g was detected in all the soil vapor <br /> samples at concentrations ranging from 11,000 µg/1 to 14,000 µg/1,benzene,toluene, ethylbenzene <br /> and xylenes were detected in every sample at concentrations as high as 54 µg/l benzene, 1,400 µg/1 <br /> toluene, 160µg/1 ethylbenzene,990µg/1 xylenes,and MTBE was detected in all the samples ranging <br /> • from 730 µg/1 to 860 µg/1 Toluene and total xylenes were detected in one sample collected from <br /> Advanced GeoEnvironmental <br /> I <br />