My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SPRECKELS
>
18800
>
2900 - Site Mitigation Program
>
PR0506459
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2020 12:46:24 PM
Creation date
5/14/2020 12:28:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506459
PE
2950
FACILITY_ID
FA0007439
FACILITY_NAME
SPRECKELS SUGAR PLANT #2
STREET_NUMBER
18800
STREET_NAME
SPRECKELS
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
SEE COMMENTS
CURRENT_STATUS
01
SITE_LOCATION
18800 SPRECKELS RD
P_LOCATION
04
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
File No. 20-3978-0LP02 K L E IN FELD E R <br /> November 5, 1996 <br /> B-2.7 Decontamination of Equipment <br /> To reduce the potential for cross-contamination, augers and associated equipment are <br /> steam cleaned prior to drilling each boring. In addition, sampling equipment is cleaned <br /> with a trisodium phosphate or non-phosphate detergent wash and rinsed with distilled <br /> water prior to collecting each soil sample. <br /> B-2.8 Soil Boring Closure and Cutting Disposal <br /> Soil borings are closed immediately after the collection and logging of soil samples. <br /> Closure is accomplished by grouting the boring with a cement(bentonite slung or as <br /> otherwise required. <br /> Drill cuttings will be placed in 55-gallon drums wrapped in plastic or spread around the <br /> boring and left on site for disposal by the site owner. If requested, Kleinfelder can <br /> coordinate disposal of soil and water after analytical results are available. <br /> B-3 GROUNDWATER WELL INSTALLATION <br /> B-3.1 Monitoring Well Construction <br /> Construction details for shallow groundwater monitoring wells are as follows: <br /> • The well casing are 2- or 4-inch inside diameter, flush threaded joint, schedule 40 <br /> PVC pipe. <br /> • The wells are constructed in 8- or 10-inch diameter borings. <br /> • Well screen sections are perforated with 0.010- or 0.020-inch factory-cut slots. <br /> • The wells are generally screened from 5 feet above to 15 feet below first <br /> groundwater. The screen length is reduced if an aquitard with a minimum <br /> thickness of 5 feet is encountered. If an apparent aquitard is encountered, the well <br /> is usually terminated 1 to 2 feet into the aquitard. Effort is made not to screen <br /> across two aquifers. If confined aquifer conditions or high vadose zone <br /> contamination are encountered, the well screen is usually not set above the depth <br /> of first encountered groundwater. Wells are usually not set in areas of suspected <br /> significant soil contamination. <br /> • The PVC pipe and end caps are steam cleaned prior to installation. <br /> 20-3978-01.P02IMP960129 Page B-4 01996, Kleinfelder, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.