My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SPRECKELS
>
18800
>
2900 - Site Mitigation Program
>
PR0506459
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2020 12:46:24 PM
Creation date
5/14/2020 12:28:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506459
PE
2950
FACILITY_ID
FA0007439
FACILITY_NAME
SPRECKELS SUGAR PLANT #2
STREET_NUMBER
18800
STREET_NAME
SPRECKELS
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
SEE COMMENTS
CURRENT_STATUS
01
SITE_LOCATION
18800 SPRECKELS RD
P_LOCATION
04
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
File No. 20-397$-O1.P02 KL E IN F E L D E R <br /> November 5, 1996 <br /> B-3.4 Well Survey <br /> The locations of soil borings and monitoring wells, and the elevation of the top of the <br /> PVC casings are usually surveyed and tied into permanent markers, if readily available. <br /> Survey accuracy is 0.1 foot for the "x" and "y" coordinates and .01 foot for the "z" <br /> coordinate. The depth to static groundwater is measured from a set location at the top of <br /> the PVC casing (usually the north rim). The depth of water is then subtracted from the <br /> elevation of the top of the well casing to provide a groundwater elevation for each <br /> monitoring well location. <br /> B-4 GROUNDWATER MONITORING <br /> B-4.1 Water Level Measurements <br /> Water level measurements are made in the wells prior to purging and sampling the wells. <br /> Measurement protocol is as follows: <br /> 1. The water level probe is decontaminated in a trisodium phosphate or non- <br /> phosphate detergent wash, followed by a distilled water rinse, prior to use in each <br /> well. <br /> 2. Water level measurements are made using a conductivity-based water-level meter. <br /> Depth-to-water is generally measured from a surveyed mark on the north rim of <br /> the PVC well casing. <br /> The water level measurements are converted to elevations using the surveyed casing <br /> elevations. <br /> B-4.2 Groundwater Sampling <br /> Groundwater samples are collected from the monitoring wells at the site. The sampling <br /> protocol for each well is as follows: <br /> 1. Down-well equipment (pumps, bailers, etc.) is decontaminated by steam cleaning, <br /> or by scrubbing in a trisodium-phosphate or non-phosphate detergent wash <br /> followed by a distilled water rinse, prior to use in each well. Bailer cord is <br /> replaced prior to use in each well. <br /> 2. The depth to groundwater is measured using a conductivity-based water-level <br /> meter. <br /> 20-3978-0 I.P02/MP960129 Page D-6 0/996, Kleinjelder, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.