Laserfiche WebLink
STALE OF CALIFORNIA GEORGE DEUKMEJIAN Govrrnor <br /> CALIFORNIA REGIONAL WATER ALITY CONTROL BOARD— 6it <br /> CENTRAL VALLEY REGION 3443 ROUTIER ROAD <br /> SACRAMENTb.CA 95827-3098 <br /> 22 January 1988 <br /> Y V t:�( <br /> Mr. Dennis Abrahamson .ENVIRONMENTAL HEALTH <br /> Simpson Paper Company, Ripon Mill <br /> Post Office Box 757 PERM!T�SERVICES <br /> Ripon, CA 95366 <br /> GROUND WATER MONITORING OF DISPOSAL AREA, SIMPSON PAPER MILL, SAN <br /> JOAQUIN COUNTY <br /> In order to determine if the 1.2 mgd discharge from Simpson Paper <br /> Mill to percolation fields has an impact on ground water quality, <br /> it is necessary to have a monitoring system in place. Therefore, <br /> Simpson Paper Co. is requested to submit a Technical Report which <br /> details a proposal to install a ground water monitoring system. <br /> The system must be able to provide the following information: <br /> 1. Sufficient water table elevation data to determine the <br /> direction of ground water flow at the site. (A gaging <br /> station in the Stanislaus River will be needed. ) <br /> 2. Water samples which are representative of ground water <br /> quality upgradient of and unaffected by the disposal fields <br /> and treatment ponds. <br /> 3 . Water samples which are representative of ground water <br /> quality downgradient of the disposal fields and treatment <br /> ponds. <br /> In many situations three monitoring wells provide enough data to <br /> make a determination of ground water flow direction. That is not <br /> the case at this site. The effects of a shallow well which pumps <br /> over 1 mgd, the nearby Stanislaus River, the Simpson percolation <br /> fields and ponds, and the City of Ripon ponds and disposal <br /> fields, make this determination difficult. The use of data from <br /> existing wells may be helpful and is acceptable if the well <br /> construction details are known and accurate well logs have been <br /> recorded. <br /> Please submit the Technical Report by 15 March 1988. We plan to <br /> include a provision in the revised waste discharge requirements <br /> for. your facility which are currently being drafted, requiring <br /> construction of the monitoring wells. <br />