Laserfiche WebLink
Mr. Dennis Abrahamson Attachment A <br /> Simpson Paper Company Page 3 of 7 <br /> Ripon, CA February 29, 1988 <br /> III. WORK DETAIL BY MAJOR TASK <br /> 1 . Write plan for installing monitoring wells to be <br /> submitted to State. Plan to include but not be limited to, <br /> a. Aqu : f er units. <br /> b. Regional direction of ground-water movement. <br /> C. Location of major pumping wells in area (city of <br /> Ripon, Nestles, Simpson Paper Co, others) . <br /> d. Rationale for monitoring well locations. <br /> e. Schematic of well completion details and depths. <br /> f. Monitoring program proposed. <br /> g. Availability of stage height at Highway 99 on <br /> Stanislaus River. <br /> Note: Unless Simpson feels otherwise, I don't believe the plan <br /> should address present water-quality conditions or the <br /> ramifications of effluent disposal on water quality. <br /> 2. Obtain plan approval from State; discuss with State; <br /> modify as necessary before implementation. <br /> 3. Prepare for drilling program. <br /> a. File drilling permits as required. <br /> b. Locate and stake holes in field. <br /> c. Order materials. <br /> 3 <br />