Laserfiche WebLink
Mr. Dennis Abrahamson Attachment A <br /> Simpson Paper Company Page 5 of 7 <br /> Ripon, CA February 29, 1988 <br /> d. Probes and data logger to be installed during the <br /> drilling and completion period of the remaining observation <br /> wells, or longer, depending on the type of information being <br /> obtained. <br /> e. Purpose of the water-level and conductivity <br /> measurements is to, <br /> ( 1 ) Evaluate the radius of influence of the <br /> pumping well (this test is not as conclusive as running a <br /> "controlled" aquifer test, but it will be informative insofar as <br /> looking at the influence of the pumping well on the shallow <br /> aquifer. <br /> (2) Evaluate any changes in water quality in OB-6 <br /> which may be caused by percolated effluent from the disposal <br /> field moving towards Well 1 . <br /> (3) Evaluate the rise and decay of any ground- <br /> water mound which may exist from effluent disposal in the <br /> easterly leachfield. <br /> 5 <br /> I <br />