Laserfiche WebLink
. REVISED MONITORING ANOPORTING PROGRAM ORDER NO-01-148 -3- <br /> FOX VALLEY CORPORATION AND FOX RIVER PAPER COMPANY <br /> RIPON MILL <br /> SAN JOAQUIN COUNTY <br /> provide written notification by certified mail within seven days of such determination and implement <br /> Response to Release section of the Standard Provisions and Reporting Requirements (1997). <br /> 5. Water Quality Protection Standard Report <br /> Any proposed changes in a statistical method or concentration limits for a constituent of concern or <br /> monitoring parameter a Water Quality Protection Standard Report shall be submitted and include the <br /> information required in Section C.1. of this Monitoring Reporting Program. Any changes to Water <br /> Quality Protection Standards shall be approved by the Executive Officer in a Revised Monitoring and <br /> Reporting Program. <br /> 6. Submittal Dates <br /> Groundwater Monitoring Reports <br /> Reporting Type Sampling Frequency Reporting Period Report Date Due <br /> and Data Reported <br /> Quarterly Daily, Weekly, Monthly 1 January — 31 March 30 April <br /> and Quarterly 1 April — 30 June 31 July <br /> I July— 30 September 31 October <br /> 1 October— 31 December 31 anuary <br /> Annual Summary Annual 1 January — 31 December 30 January <br /> Facility Monitoring Report 15 November <br /> Response to a Release as necessary <br /> Water Quality Protection Standard Report <br /> as necessary <br /> C. WATER QUALITY PROTECTION STANDARD AND COMPLIANCE PERIOD <br /> 1. Water Quality Protection Standard Report <br /> For each waste management unit (Unit), the Water Quality Protection Standard shall consist of all <br /> constituents of concern, the concentration limit for each constituent of concern, the point of compliance, <br /> and all water quality monitoring points. <br /> The Water Quality Protection Standard for naturally occurring waste constituents consists of the <br /> constituents of concern, the concentration limits, and the point of compliance and all monitoring points. <br /> The Executive Officer shall review and approve the Water Quality Protection Standard, or any <br /> modification thereto, for each monitored medium. <br />