Laserfiche WebLink
COMMENTS ON DEVELOPMENTS <br /> UP-92-12 <br /> 3 . Encroachment permit shall be required for work within road <br /> right-of-way. (Streets and Highway Title Section 10-3103) <br /> 4 . The Traffic Impact Mitigation Fee will be required for this <br /> development. The fee is due and payable at the time of <br /> building permit application. (The fee currently are $1, 561. 00 <br /> per 1, 000 gross square foot of building as "Service Commercial" <br /> $1, 093 . 00 per 1, 000 gross square foot of building as <br /> "Warehouse" or $223 . 95 per trip-end generated in the Ripon <br /> area. If there is no building permit required, the fee will <br /> be exempt. The fee shall be automatically adjusted July 1 of <br /> each year by the Engineering Construction Cost Index as <br /> published by the Engineering News Record. ) <br /> (Resolution R-90-304) <br /> c: Manuel Lopez <br /> Deputy Director/Devel6pment <br /> 2 <br />