Laserfiche WebLink
CONDITIONS OF APPROVAL <br /> UP-89-21 <br /> French Camp Baptist Church <br /> Unless otherwise specified, all Conditions of Approval shall be <br /> complied with prior to the establishment of the use and the <br /> issuance of any building permits. <br /> The approval will expire 18 months from the date of approval unless <br /> (1) all Conditions of Approval have been complied with, (2) all <br /> necessary building permits have been secured and remain in force, <br /> and (3) all necessary permits from other agencies have been secured <br /> and ,remain in force. <br /> 1. PLANNING DIVISION: <br /> Conditions of Approval: <br /> a. Landscaping: <br /> (1) A minimum five percent of the area must be <br /> landscaped. <br /> (2) One tree is required for each 10 parking stalls, or <br /> portion thereof. Trees must be selected from the <br /> County' s Approved Tree List. <br /> (3) A minimum five-foot-wide landscaped strip is <br /> required along the public streets. <br /> (4) Planters which abut parking stalls shall be a <br /> minimum of five feet wide. A minimum 18-inch-wide <br /> paved strip shall be added to the adjacent parking <br /> stall to allow access to and from vehicles. <br /> b. Parking: <br /> (1) All parking spaces, driveways, and maneuvering areas <br /> must be paved and permanently maintained with <br /> asphalt or cement. Bumper guards must be provided <br /> where necessary to protect adjacent structures or <br /> properties. <br /> (2) All parking stalls and driveway directions shall be <br /> delineated. <br /> C. Parking lot lighting shall meet the following minimum <br /> standards: <br /> Conditions of: Approval - 1 - (UP-89-21) <br />