Laserfiche WebLink
that they have the capacity to serve the development and <br /> that the system meets State standards. <br /> d. At the time of development, construct an individual <br /> sewage disposal system under a permit and inspection by <br /> the Environmental Health Division. <br /> 4 . STOCKTON METROPOLITAN AIRPORT: <br /> Conditions of Approval: <br /> a. The storm water retention pond shall be designed to <br /> percolate within 24 hours in normal periods and within <br /> 48 hours in peak conditions. <br /> b. A Deed of Avigation and Hazard Easement shall be granted <br /> to the County. This easement shall be recorded as a deed <br /> restriction flowing in perpetuity to all successor <br /> property owners. <br /> 5. AIR POLLUTION CONTROL DISTRICT: <br /> Conditions of Approval: <br /> a. Dust control measures shall be implemented during all on- <br /> site construction. <br /> NOTE: On June 7, 1990, the San Joaquin County Planning <br /> Commission approved UP-89-21 subject to the Conditions <br /> of Approval listed above. <br /> Conditions of, Approval - 4 - (UP-89-21) <br />