Laserfiche WebLink
OPpu!N C• <br /> 'F COUNTY OF SAN JOAQUIN <br /> EUGENE DELUCCHI <br /> CHIEF DEPUTY DIRECTOR <br /> DEPARTMENT OF PUBLIC WORKS <br /> P.O.BOX 1810-1610 E.HAZELTON AVENUE THOMAS R.FLINN <br /> STOCKTON.CALIFORNIA 95201 DEPUTY DIRECTOR <br /> (209)466-3000 MANUEL LOPEZ <br /> DEPUTY DIRECTOR <br /> PAYNE <br /> HENRY M. HIRATA a RICHARD C.DIRECTOR■�1`;I7y�"Y� PU TY DIRECTOR <br /> DIRECTOR '','p+�,Q � �I f " <br /> May 20, 1992 <br /> 1 t <br /> M_E_M_O_R_A_N_D_U_M !�'rJ'( 1992 <br /> TO: Thomas M. Gau, Senior Civil En4ywiok;r11YUtl <br /> t <br /> Community Development Department <br /> CONTACT PERSON: Loree Goold P1-?ran11VGDL1Lv1sl'+0f4 <br /> FROM: Charles Kelley, Senior Civil Engire <br /> Public Services Division <br /> SUBJECT: SA-92-30 for a kennel for a maximum of 80 dogs. Located <br /> on the N. side of State Rt. 4 , E. of Van Allen Rd. , W. of <br /> Farmington. <br /> APPLICANT: Marlin Presser APN: 183-330-21 <br /> INFORMATION: <br /> The site is not located within a Federal Flood Insurance <br /> Administration Designated Flood Hazard Area. <br /> State Route 4 has an existing right-of-way width of 80 feet, and <br /> a planned right-of-way width of 110 feet. <br /> RECOMMENDATIONS: <br /> 1. The Traffic Impact Mitigation Fee will be required for this <br /> development. The fee is due and payable at the time of <br /> building permit application. (The fee currently is $1, 511. 00 <br /> per 1, 000 gross square foot of building as "Service Commercial" <br /> or $216.76 per daily trip-end generated in the Linden area. <br /> If there is no building permit required, the fee will be <br /> exempt. The fee shall be automatically adjusted July 1 of each <br /> year by the Engineering Construction Cost Index as published <br /> by the Engineering News Record. ) <br /> (Resolution R-90-304, R-91-1025) <br /> 2 . The Water Supply Facilities Impact Mitigation Fee will be <br /> required for this development. The fee is due and payable at <br /> the time of building permit application. (The fee currently <br /> is $221.26 per 1, 000 gross square foot of building as <br /> "Service Commercial" . If there is no building permit required, <br /> the fee will be exempt. The fee shall be automatically <br /> increased on January 1 of each year at the rate of 6.9 percent. <br /> An additional 3 . 5 percent shall be added to the fee upon <br /> payment for processing and administering the program. <br /> (Resolution R-91-327) <br /> c: Manuel Lopez, Deputy Director/Development <br />