Laserfiche WebLink
3 MONITORING WELL DEVELOPMENT AND WELL SURVEYING <br /> Well development for both wells was completed on May 3, 2006. The wells were first <br /> bailed in attempts to surge and remove large sediment from the sand pack and the <br /> surrounding stratigraphy. During well development, field parameters were taken for <br /> pH, Electrical Conductance (EC), temperature and turbidity. Stable field parameter <br /> readings were observed in order to assess aquifer representation. Bailing proceeded <br /> until discharge water was relatively sediment free, and turbidity readings were low. <br /> Once sediment had been removed a submersible pump was used to finalize <br /> development for each well. The submersible pump was used to pump out any fine <br /> grained material and achieve the lowest possible turbidity. At a minimum at least ten <br /> pore volumes were removed for each well. A total of 175 gallons of water were <br /> removed from well MW-11 during well development. The turbidity was observed at <br /> 5.64 NTU, pH stabilized at 6.64 and Specific Conductance (SC) stabilized at 1,010 <br /> µmhos/cm. For well MW-10, a total of 176 gallons of water was removed. The turbidity <br /> j was 5.52 NTU, pH was 6.78, and a Specific Conductance at 1,232 µmhos/cm was noted. <br /> Field data sheets are provided in Appendix A. <br /> The new and preexisting monitoring wells were surveyed in May 11, 2006 by Giuliani <br /> ` and Kull, Inc. Table 1 provides horizontal coordinates and measuring point elevations <br /> for each well relative to an on site datum. <br /> Table 1 <br /> Coordinates and Elevations for Monitoring Wells <br /> City of Riverbank Wastewater Treatment Plant <br /> Location Measuring Pt. (TOC Elevations) Easting Northing <br /> MW-1 97.36 6,430,362.399 2,093,819.678 <br /> MW-2 96.74 6,430,045.889 2,093,247.485 <br /> MW-3 89.02 6,431,172.344 2,093,013.182 <br /> MW-4 91.75 6,433,642.930 2,093,389.221 <br /> MW-5 89.65 6,431,542.130 2,094,955.594 <br /> MW-6 105.71 6,434,544.470 2,093,500.701 <br /> MW-7 92.59 6,430,037.403 2,094,789.386 <br /> MW-8 94.04 6,429,037.189 2,093,044.461 <br /> MW-9 92.34 6,429,853.302 2,093,529.374 <br /> MW-10 102.152 6,432,666.068 2,094,098.459 <br /> MW-11 104.55 6,432,792.814 2,093,382.428 <br /> City of Riverbank Wastewater Treatment Plant Monitoring Well Installation May 2006 <br /> DE Project No.:109-06 9 Rev.0 <br />