My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STOCKTON
>
1137
>
2900 - Site Mitigation Program
>
PR0530031
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 9:23:11 AM
Creation date
5/18/2020 9:10:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0530031
PE
2960
FACILITY_ID
FA0019740
FACILITY_NAME
IDEALEASE (FORMER)
STREET_NUMBER
1137
Direction
S
STREET_NAME
STOCKTON
STREET_TYPE
ST
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
1137 S STOCKTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
22 September 2009 <br /> AGE-NC Project No. 09-1692 <br /> Page 4 of 11 <br /> Each of these task are detailed below. <br /> 3.1. PERMITTING AND PRE-FIELD WORK PREPARATIONS <br /> Applicable soil boring permits will be obtained from the San Joaquin County Environmental Health <br /> Division(EHD). <br /> A Site Health and SafetyPlan(SHSP)will be prepared in accordance with Occupational Safety and <br /> Health Guidance Manual for Hazardous Waste Site Activities(National Institute for Occupational <br /> Safety and Health Administration)and federal(29 CFR 1910.120)and state(Title 8,Cal.Code Reg., <br /> Section 5192)regulations. The SHSP will cover: <br /> • Health and safety officer andkeypersonnel,andpersonnel requirements and responsibilities; <br /> • Field activities, overall work practices and standard operating procedures;. <br /> • On-site chemicals and potential hazardous substances as well as physical hazards; <br /> • Risk analysis for existing site conditions, and description of personal protective equipment <br /> to be used by personnel; <br /> • Site control measures,including work zones and security measures,and entryprocedures for <br /> confined spaces; and <br /> • Exposure monitoring plan with monitoring methods, emergency response plan addressing <br /> hazardous material/waste releases, and medical surveillance requirements. <br /> All field personnel will be trained in hazardous materials communication and will have completed <br /> a 40-hour Health and Safety Course as specified in OSHA Hazardous Waste Operations and <br /> Emergency Response Standard [29 CFR 1910.120(e)], and 8-hour annual refresher courses as <br /> necessary. Prior to mobilization, the area of investigation will be clearly marked and a utility <br /> clearance obtained through Underground Service Alert. <br /> 3.2. BORING ADVANCEMENT <br /> AGE proposes to advance seven soil probe borings at the following locations (Figure 2): <br /> • One shallow soil boring will be advanced approximately 30 feet northeast of boring B5 to <br /> define shallow soil contamination. <br /> • Two `deep' soil borings will be advanced within the truck wash area to define deep and <br /> Advanced GeoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.