Laserfiche WebLink
, 1 ) <br /> • • <br /> General Safe Work Practices: <br /> Drillers, heavy equipment operators and other onsite personnel will be briefed each day in 'tailgate" meetings as to the <br /> day's goals and equipment to be used. Anticipated contaminants and emergency procedures will be reviewed. <br /> Appropriate personal protective equipment will be put on and verified correct by SSO, including respirator fit. Drilling <br /> and sampling equipment will be steam-cleaned before being brought on site. Split-spoon sampling equipment will be <br /> cleaned before each use. <br /> Training Requirements: <br /> The SSO will conduct a pre-site training session which will include all points of MSDS forms, contaminant properties, <br /> warning signs,health hazard data, risk from exposure,and emergency first aid. The SSO will assure that everyone fully <br /> understands site hazards. <br /> Medical Surveillance Program: <br /> According to CFR 29, 1910.120,Paragraph(1),employees who wear respirators 30 days or more during one year or who <br /> have been exposed to hazardous substances or health hazards above established permissible exposure limits are required <br /> to be monitored medically. All site personnel will be required to have had a complete chemical physical within the past <br /> year. <br /> Record Keeping: <br /> Documentation will be kept on personnel exposed to contaminant hazards on the job site according to OSHA regulations. <br /> These will include documentation that employees received training on the SSP,respiratory protection,MSDS forms,and <br /> all emergency procedures. These will be reviewed during the pre-site training meeting. <br /> Exposure records on each job will be kept for 30 years to meet requirements. Included will be names and social security <br /> number of employees, medical evaluation, on-the-job logs from entry to exit, first aid administered, visits on site by <br /> outside persons,and personal air monitoring records. <br /> Contingency Plans: <br /> In the event of accident, injury, or other emergency, the Project Director, Senior Project Manager, or other person will <br /> notify appropriate government agencies or individuals as follows: <br /> 1. Police,Fire,or Ambulance emergency 911 <br /> 2. Nearest Emergency Hospital:Dameron Hospital <br /> 155 Glasson Way <br /> Stockton,CA <br /> (209)9445550 <br /> Directions to Hospital: <br /> Go north on South Aurora Street 0.05 mi; tum left onto East Hazelton Avenue; after 0.1 mi turn right onto South <br /> Stanislaus Street; go 0.3 mi; tum left onto Highway 4 onramp and continue 0.5 mi; tum right onto Interstate 5 North, <br /> continue 1.1 mi; exit right onto North Pershing Avenue,go 0.5 mi, tum right onto West Acacia Street. Hospital on left. <br /> Follow signs to emergency room. <br /> Emergency Numbers for Lush Geosciences Inc Personnel, <br /> Mr. Andrew Lush, P.G. of Lush Geosciences, Inc. will serve as the Senior Project Manager. He may be contacted by <br /> calling the following number: Office Phone: (916)961-8380. Mr. Lush will also serve as the onsite geologist and SSO. <br /> He may be contacted at the work site by calling the following number:Cell Phone:(916)878-7851. <br />