Laserfiche WebLink
r <br /> 3 3 3 Future Work <br /> Future work planned in the remainder of the Third Quarter and Fourth Quarter 2003 include the <br /> fol lowing tasks <br /> ' 0 Conduct Fourth quarter 2003 monitoring and sampling event In September <br /> • Conduct monthly sampling of domestic well DW-1 <br /> ' 0 Re-assemble the ozone sparge system and return to service before the end of July 2003, <br /> perform monthly O&M for the ozone infection system <br /> ' a Conduct weekly PID readings on the vapor influent and effluent, perform monthly O & M <br /> for the SVE system <br /> • Retrieve purge pump lodged In well MW-5D <br /> 1 <br /> 1 � <br /> r <br /> r <br /> r <br /> r <br /> r <br /> r <br /> r <br /> r <br /> r <br /> r <br /> 58643-06-01 -8- July 25,2003 <br /> r <br />