Laserfiche WebLink
w=. <br /> - <br /> r 30 September 2005. <br /> AGE-NC Project-No. 97 0343 -- _ <br /> Page 2 of 6 <br /> 2.1. PERMITTING AND'PRE-FIELD.WORK ACTIVITIES <br /> `Applicable site permits4i'06 obtained from the San•Jo_aquin County(i a 'building,electrical,etc.) <br /> and from the San Joaquin-County Air.Pollution Control District(SJCAPCD).In addition,an update <br /> to the, health and safety plan.presently-oil-file will_be,prepared'-in accordance with'.rOccupational ., <br /> Safety ond.Health F.--Guidane_e,lLlanual'foi=-Ha'zardous Wasti Site Activities (Nationid--Institute; for <br /> _ Occupational Safety and Health-'Adm nistration, U.S. Coast. Guard_ and'`U.S.�_Environrr ental ,r <br /> Protection Agency, 1985).'-Prior to mobilization,-all underground trenching areas will be clearly <br /> _= marked and a utility clearance:obtain <br /> ed-through Underground-Service _Alert. <br /> .- <br /> f' = -2.2. Y:: INSTALLATION ORR.EMEDIATION WELLS <br /> Currently, SVE wells VW 1,VW-2 and VW 3 ale screened through the yadose zone and located <br /> in <br /> the core-area of the-soil petroleum-impacted area at.the site. Based on thie results of the.SVE pilot <br /> test conducted at the site in January 2002,a tlieoretical•radiusof'influence of 47 feet was estimated t <br /> for SVE;,the estimated SVE_radius of mtluence.at wells V W 1-,VVit-2 and VW-3 and the.Core-area . <br /> of petroleum-impacted soil are depicted"in'Figure 2.';Utilization of wells VW-1, VW 2-and VW-3 <br /> _ and the'dual competed counterparts of these well s;.mOhl toring wells MW-1;MW-2:.and MW=3 (as <br /> :these wells are currently dry) for-an interim remediation SVE system should,be adequate to cover 'r , <br /> _. . - <br /> _`. Y : . the core-area of.petroleum-imp -acted soil <br /> _2:3: INSTALLATION OF=-INTERIM REMEDIATION SYSTEM PIPING NETWORK '. <br /> - + <br /> A remediation system.pipingrietwork willbe installed underground in a 4 8-inch wide by a18 inch - y <br /> --: ."..deep trench; the proposed'tre_nching location,is-depicted in Figure 2;a cross sectional view of the <br /> trench is: depicted -in Figure.3 In the trench, two-inch diameter,.schedule`.80 PVC piping:will <br /> be connected to amanifold-from the well-heads at VW-1,VW:-2 VW-3;MW-1,MW'-2'and MW-7-3 <br /> and routed to the proposed=vapor extraction-uriit.=Followingpiping placement,:the trench Will'be <br /> backfilled with imported road-,base sand,compacted and resurfaced withasphalt:. <br /> - - .-_ - _ 4 <br /> _ _Installation of a-15-foot wide=by 15-foot 1',ong enclosure utilizing temporary chain-link fencing with ` <br /> . a'gate will be located.northwest of the building on site to secure the_vapor,extraction_unii and the <br /> round water treatments sterni.:The proposed remediation system fencing enclosure is-illustrated in <br /> Figure 4.- r °fig;. Y � i <br /> -- <br /> -` dvatrced GeAnvironmental,Inca - - <br /> ; � t <br />