Remediation Confirmation Work Plan <br /> Former FISCO WAREHOUSE (Howard Lenz Property) <br /> 1648 Shaw Road, Stockton, California <br /> 1.0. INTRODUCTION <br /> At the request of Mr.Peter Lenz,on behalf of Mrs.Alice G.Lenz,Advanced GeoEnvironmentai,Inc. <br /> (AGE) has prepared this Remediation Confirmation Work Plan for 1648 Shaw Road, Stockton, <br /> California (site). In accordance with the San Joaquin County Environmental Health Department <br /> (EHD) letter dated 02 January 2009 (Appendix B),the scope of work includes advancement of two <br /> confirmation soil probe borings for collection and analyses of soil samples to evaluate the <br /> effectiveness of soil vapor extraction (SVE) remediation at the site. The location of the site is <br /> illustrated on Figure 1. A plan of the site is illustrated on Figure 2. Site background information is <br /> provided in Appendix A. <br /> This workplan has been prepared in accordance with Central Valley Regional Water Quality Control <br /> Board (RWQCB) guidelines for investigation of underground storage tanks (UST) sites. <br /> The SVE system began operation on 19 January 2006 with a total of 3,451 lbs of total petroleum <br /> hydrocarbons quantified as gasoline (TPH-g) extracted since the system began operation. TPH-g <br /> concentrations were declining or below detection levels and appeared to be reaching an asymptotic <br /> plateau,therefore,on 30 May 2008,the SVE unit was taken off-line for an EHD-approved"rebound" <br /> period. On 27 October 2008, after approximately 5 months of SVE cessation, the SVE system was <br /> brought on-line for rebound testing to determine if hydrocarbon concentrations in soil vapor <br /> remained at or below detection limits.Results of rebound testing conducted during the fourth quarter <br /> 2008 indicated the hydrocarbon mass remaining in soil had been reduced to a level that could no <br /> longer be successfully remediated by SVE. Rebound testing ended on 17 December 2008, and the <br /> SVE system was taken off.-line. <br /> 2.0. SCOPE OF WORK <br /> The scope of work includes the advancement of two confirmation soil borings for collection of soil <br /> samples. The site assessment will include the following tasks: <br /> • Pre-field work activities;. <br /> • Soil sample collection and analysis; <br /> • Report preparation. <br /> Advanced GeoEnvironmentai,Inc. <br />