My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0010165
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SHAW
>
1648
>
3500 - Local Oversight Program
>
PR0545689
>
ARCHIVED REPORTS_XR0010165
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 4:04:48 PM
Creation date
5/18/2020 3:28:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010165
RECORD_ID
PR0545689
PE
3528
FACILITY_ID
FA0005164
FACILITY_NAME
FISCO WAREHOUSE
STREET_NUMBER
1648
STREET_NAME
SHAW
STREET_TYPE
RD
City
STOCKTON
Zip
00000
CURRENT_STATUS
02
SITE_LOCATION
1648 SHAW RD
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> s ` <br /> Advanced GeoEnvironmental, Inc <br /> SITE HEALTH AND SAFETY PLAN <br /> AGE-NC Project Number 97-0343 Prepared By Brian Millman <br /> Project Name Fisco Warehouse Date 18 August 2000 <br /> Project Location 1648 Shaw Road, Stockton, CA Project Manager Brian Millman <br /> Anticipated Start Date September 2000 Duration 8 hours <br /> 1.0. SITE DESCRIPTION <br /> Area affected Proximal, immediate area around probings <br /> Surrounding population Commercial <br /> Topography Flat Weather Condition waren <br /> Additional Information <br /> 2.0. ON-SITE ORGANIZATION AND COORDINATION <br /> Project Team Leader Robert Marty <br /> Site Safety Officer Brian Millman <br /> Field Team Officer Brian Millman <br /> Field Team Members Brian Millman <br /> . Geoprobe Operator <br /> Local Agency San Joaquin County Public Health Services - Environmental Health <br /> Division <br /> P. O. Box 388 Stockton, CA 95201 <br /> Brian Millman has been designated to coordinate access control and security onsite A safe <br /> perimeter has been established at 15 feet around boring/excavation. No unauthorized person <br /> should be within this exclusion area <br /> 3.0. HAZARD EVALUATION <br /> The following substance(s) or hazards are known or suspected to be on site <br /> Gasoline 13,000 mg/kg <br /> Diesel 2,600 mg/kg <br /> BTEX 1,100 mg/kg <br /> Advanced GeoEnvironmental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.