My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PORT
>
0
>
2900 - Site Mitigation Program
>
PR0522547
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 4:40:38 PM
Creation date
5/18/2020 4:35:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0522547
PE
2960
FACILITY_ID
FA0015361
FACILITY_NAME
RICE TERMINALS
STREET_NUMBER
0
STREET_NAME
PORT
STREET_TYPE
RD
City
STOCKTON
Zip
95212
APN
14502009
CURRENT_STATUS
01
SITE_LOCATION
PORT RD A
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k'q KLEINFELDER <br /> • Lithologic Logs <br /> • Tabulated results of soil and groundwater samples with copies of certified results <br /> • A graphical representation of soil and groundwater sampling locations <br /> • Description and documentation of QA/QC procedures employed for field and laboratory <br /> work <br /> • Kleinfelder's conclusions and recommendations based on the data acquired. <br /> All information gathered during the study by Kleinfelder is considered confidential and will be <br /> released only upon written authorization from the client or as required by law. California law <br /> requires a person to inform the state if a situation is encountered that can be considered an <br /> immediate endangerment to the public's health or welfare and/or to the environment. Therefore, <br /> the client will be contractually bound to make any said disclosures in lieu of Kleinfelder, its <br /> owners, principals, employees or subcontractors. <br /> PROJECT SCHEDULE <br /> The proposed scope of work would be performed in accordance with the following approximate <br /> schedule. <br /> Approximate Task- <br /> Timeline <br /> askTimeline <br /> Week 0 Formal authorization provided by the client <br /> Week 1 Permitting for Limited Soil and Groundwater Assessment, <br /> Week 3 Limited Soil Assessment Field Work <br /> Week 3 Limited Soil Assessment Chemical Analysis" <br /> Week 4—5 Limited Soil Assessment Draft Report Preparation <br /> Week 6 Limited Soil Assessment,Draft Report submitted to the client <br /> l Kleinfelder has no control over the time required by a regulatory agency to review and approve permit <br /> applications or to supply information from their files for review. <br /> 2 This work will be done by a subcontractor. Kleinfelder selects reputable subcontractors, but does not have full <br /> control over the time required by said companies. <br /> ASSUMPTIONS AND CLIENT RESPONSIBILITIES <br /> The proposed scope of services and estimated budget are based on the following: <br /> • The cover letter (attached) is an integral part of this proposal. <br /> • HCB will assist Kleinfelder in obtaining access to the site and owner authorization for the <br /> proposed sampling. <br /> • Adequate work space and access will be provided. Kleinfelder will attempt to advance <br /> soil push probes and collect samples at the proposed locations. If the drilling equipment <br /> cannot be positioned or it refusal occurs, alternative drilling locations or sampling <br /> methods should be investigated. <br /> 02001 PROP.ENV/ST04P I65/DGD:ss Page 3 of 6 <br /> Copyright 2004, Kleinfelder, Inc. April 19,2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.