Workplan for Aquifer Pumping Test, <br /> Well Installation&Well Destruction <br /> Southwest Hide Company,Manteca,CA <br /> Project No.W0508.00 <br /> Page 4 <br /> or until fluid stabilizes. Response will be monitored in the extraction well and also in two <br /> temporary wells and existing wells 5, 15, and 17 throughout the tests. It is proposed that <br /> extracted groundwater be discharged directly to the adjacent field for the duration of the test. <br /> The concentration of TDS in well 8 was 192 milligrams per liter (mg/P) during the last <br /> monitoring episode in June 1993. The concentration of TDS in Well 8 has consistently been <br /> well below the maximum contaminant level of 1000 mg/f established by the State of California <br /> for drinking water (Second Quarter 1993 Groundwater Monitoring Report, Southwest Hide <br /> Company Facility, RESNA Industries, Inc., June 28, 1993). <br /> Task 6 - Abandon Temporary Monitoring Wells <br /> Following the completion of the aquifer pumping test the two temporary monitoring wells will <br /> be abandoned according to the procedures outlined in Task 2. <br /> Task 7 - Summary Report Preparation <br /> A letter report will be prepared and submitted to the RWQCB and San Joaquin County <br /> Department of Environmental Health. The report will detail test procedures and results and will <br /> include an evaluation of the feasibility of groundwater remediation by extraction as part of the <br /> GWRAP. This letter report will also include a summary of the well installations and <br /> abandonments along with corresponding boring/well logs and analytical results. <br /> PROJECTED SCHEDULE <br /> The projected schedule for completing the tasks described above are as follows: <br /> • Task 1 - Permitting and Scheduling 1 Week <br /> • Task 2 - Abandon Two Existing Wells 1 Day <br /> • Task 3 - Install Three Wells 1 Day <br /> • Task 4 - Well Survey and Development 1/2 Day <br /> • Task 5 - Conduct Aquifer Pumping Test 1 1/2 Days <br /> • Task 6 - Abandon Two Temporary Wells 1 Day <br /> • Task 7 - Summary Report Preparation 3 Weeks <br /> WP-0893.FNL <br />