Laserfiche WebLink
y <br /> Workplan for Aquifer Pumping Test, <br /> Well Installation&Well Destruction <br /> Southwest Hide Company,Manteca,CA <br /> Project No.W0508.00 <br /> Page 3 <br /> Task 3 - Installation of Three Groundwater Monitoring Wells <br /> One groundwater well will be installed as a replacement well for existing Well 1. The well will <br /> be located outside the proposed cap. Two temporary wells will be installed to serve as <br /> monitoring points for the aquifer pumping test. They will be located within 50 feet of the <br /> proposed extraction well. <br /> Three borings will be advanced using 10-inch O.D. hollow stem augers. The approximate total <br /> depths of the replacement well and of the temporary wells are 38 feet and 20 feet, respectively. <br /> Drilling will be conducted by a State-licensed (C57) drilling company. A field geologist will <br /> be present to log all drill cuttings and soil samples. Descriptions of soil types encountered, <br /> sample collection intervals, and well construction details will be recorded on boring/well logs <br /> and included in the summary report. Soil samples will be collected at five foot intervals from <br /> the replacement well boring. <br /> One soil sample collected from each boring will be sent using chain-of-custody record to a State- <br /> certified laboratory for analysis of TDS, sodium, and chloride. The borings will be completed <br /> as groundwater monitoring wells. Monitoring wells will be constructed of PVC well screen and <br /> casing. The replacement well will be 4-inches in diameter and the temporary wells will be 2- <br /> inches in diameter. A 0.010-inch well screen slot and #2/12 mesh sandpack will be used. Neat <br /> cement will be used to seal the wells in accordance with California Well Standards (December <br /> 1981). To protect the integrity of the wells, a locking, water-tight well plug will be installed <br /> on the wells. Typical well details are shown on Figure 3. <br /> Task 4 - Well Surveying and Development <br /> Following installation of the wells the top of the wellheads will be surveyed and tied into the <br /> existing wells. Measurement of depth to water in wells will be completed. For development <br /> of the wells a minimum of three well volumes (casing and sandpack) will be purged. <br /> Temperature, pH, water elevation, and electrical conductivity will be measured and allowed to <br /> stabilize. The replacement well will be sampled during the next quarterly monitoring event. <br /> Task 5 - Conduct an Aquifer Pumping Test <br /> RESNA will conduct a 24-hour aquifer pumping test to determine groundwater characteristics <br /> beneath the site. Well 8 will be used as the extraction well for the test. A series of short term <br /> step-drawdown tests will be performed to determine the sustainable pumping rate form Well 8. <br /> The primary pumping test will consist of extracting groundwater from Well 8 for up to 12 hours <br /> WP-0893.FNL <br />