Laserfiche WebLink
Describe the final disposition of the overburden: No overburden exists <br /> however, fine materials deposited within the settling basin s will either be _ <br /> mar e e as op sol or e spreag an a�sKed on agricultural land adjacent to screenin; <br /> Indicate the maximum working slope: facilities outside of 100 year flood plain. <br /> 1 1/2 to 1 within the river and or the natural anale of repose. <br /> OPERATION CHARACTERISTICS <br /> Describe any processing to .be done on-site: Hydraulic dredging , screeing <br /> and classif in p d <br /> -letter7. <br /> List type of equipment or machinery used in the project and method <br /> of excavation: Cutterhead suction dredge screein se ar ti <br /> equipment (see attached letter ) . <br /> List equipment or- processes used in this project that generate air <br /> pollutants or required an Air Pollution Control District permit: <br /> None <br /> List any operations which will cause noise or vibration: Dredging (noise) <br /> haul trucks (noise and vibration) <br /> Describe any trees or vegetation be removed: None <br /> List all no weeds on the site: None <br /> Where will materials be stockpiled: Adjacent to screenino eouiDment <br /> 1 If explosives will be used, explai;:'None <br /> Usual days and hours of operation: Monday through Saturday - 12 hours Der <br /> day. <br /> If any canal, pipeline, railroad, etc. , will be crossed, explain: <br /> Railroad crossing, see previous permit (QX-86-5) <br /> Quarry Excavation <br /> - 11 - (7/84 ) <br />