My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013303
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MOSSDALE
>
640
>
2600 - Land Use Program
>
QX-88-2
>
SU0013303
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 1:45:13 PM
Creation date
5/19/2020 11:11:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013303
PE
2600
FACILITY_NAME
QX-88-2
STREET_NUMBER
640
Direction
W
STREET_NAME
MOSSDALE
STREET_TYPE
RD
City
LATHROP
Zip
95330-
APN
23903009
ENTERED_DATE
5/18/2020 12:00:00 AM
SITE_LOCATION
640 W MOSSDALE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Describe any trees or vegetation to be removed: None <br /> Describe the haul route to the public road and the means of dust <br /> control : Same as QX-86-5 <br /> Amount and source of water used: Approximately 3,500 G. P. M. to be used <br /> during dredging operations, all of whs amount used Tor oust control <br /> and s ig increase in evapora ion in settlino asins will e re urne o ne <br /> river see a ac e e tern . <br /> Describe the method of water disposal : Clarification and gravity decant back <br /> to the San Joaquin River (see attached letter) . <br /> Describe the means of preventing water pole attached an letter.bidity <br /> increases in ground and surface water: <br /> If the project adjoins any river course, levee, floodplain or other <br /> water feature, describe the hydrology and proposed means of pro— <br /> tecting the watercourse: All material removed from the river will be processed <br /> outside the flood plain at previous approvediprocessinq area' via a <br /> sealed eavy duty po _yethe yne pipeline. <br /> REHABILITATION <br /> Describe the ultimate use of the property when the project is <br /> complete: Agricultural <br /> Describe the rehabilitation schedule. If the excavation will be <br /> conducted in phases, clearly describe the phasing. Attach charts, <br /> maps, or diagrams to show what operations will be conducted in each <br /> area during each phase: Removal of all equlpment5 stockpiled materials and <br /> I re- radinq of disturbed soil to original condition. This will all be <br /> accomplished within 12 months. <br /> State the proposed means of financially guaranteeing rehabilitation <br /> of the excavation: N/A <br /> Quarry Excavation — 12 — (7/84 ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.