Laserfiche WebLink
Describe any trees or vegetation to be removed: None <br /> Describe the haul route to the public road and the means of dust <br /> control : Same as QX-86-5 <br /> Amount and source of water used: Approximately 3,500 G. P. M. to be used <br /> during dredging operations, all of whs amount used Tor oust control <br /> and s ig increase in evapora ion in settlino asins will e re urne o ne <br /> river see a ac e e tern . <br /> Describe the method of water disposal : Clarification and gravity decant back <br /> to the San Joaquin River (see attached letter) . <br /> Describe the means of preventing water pole attached an letter.bidity <br /> increases in ground and surface water: <br /> If the project adjoins any river course, levee, floodplain or other <br /> water feature, describe the hydrology and proposed means of pro— <br /> tecting the watercourse: All material removed from the river will be processed <br /> outside the flood plain at previous approvediprocessinq area' via a <br /> sealed eavy duty po _yethe yne pipeline. <br /> REHABILITATION <br /> Describe the ultimate use of the property when the project is <br /> complete: Agricultural <br /> Describe the rehabilitation schedule. If the excavation will be <br /> conducted in phases, clearly describe the phasing. Attach charts, <br /> maps, or diagrams to show what operations will be conducted in each <br /> area during each phase: Removal of all equlpment5 stockpiled materials and <br /> I re- radinq of disturbed soil to original condition. This will all be <br /> accomplished within 12 months. <br /> State the proposed means of financially guaranteeing rehabilitation <br /> of the excavation: N/A <br /> Quarry Excavation — 12 — (7/84 ) <br />