Laserfiche WebLink
f � - <br /> CHRONOLOGY <br /> PACIFIC BELL UE042 <br /> 345 NORTH SAN JOAGUIN STREET, STOCKTON CA 95202 <br /> SITE CODE: 1867 <br /> The site is located on the southwest intersection of San Joaquin St and Lindsey Street. <br /> The San Joaquin County APN is 139-140-01 . The site encompasses one-half of a block <br /> and contains communication equipment for Pacific Bell and AT&T. Two underground <br /> storage tanks that were located in the basement were closed in-place on December 17, <br /> 1990 because underground structural supports prevented their removal and remediation of <br /> the soil contamination evidenced. Three underground storage tanks were removed on <br /> November 10, 1993 from the sidewalk area north of the site and an excavation attempted <br /> to remove the soil contamination. Residual soil contamination continued to be evidenced <br /> and following further characterization. It was determined that the residual soil <br /> contamination would not pose a threat to groundwater quality. In 1991 three groundwater <br /> monitoring wells were installed and limited groundwater contamination was evidenced. <br /> PHSIEHD has reviewed all site conditions and has determined that site closure/certification <br /> is warranted. <br /> 1990 <br /> 06/11/90 Soil borings in the area of the underground storage tanks located in the <br /> basement to investigate the possibility of an unauthorized release associated <br /> with the operation of the tanks. Soil contamination evidenced. See the <br /> attached summary of basement soil sample analytical results for soil borings: <br /> SS1 - SS4 . <br /> 12/17/90 Two underground storage tanks were closed in-place. Tank #3 was a 300 <br /> gallon diesel tank and tank #4 was a 550 gallon diesel tank. <br /> 1991 <br /> 1217191 Drilling was initiated to install monitoring wells, MW1 - MW3 to investigate <br /> groundwater quality impacts which may have resulted from the soil <br /> contamination evidenced on June 11, 1990. See the attached summary of <br /> soil sample analysis results December 7 and 8, 1991 and the boring logs for <br /> MW1 -MW3. <br /> 12/12/91 Groundwater quality data collection was initiated. See the attached <br /> historical water level data summary and the summary of groundwater sample <br /> analytical results (Dec 1991 - Juiy 1994). <br /> 1.992 <br /> Groundwater monitoring and sampling continued. <br /> 1993 <br /> 02/03/93 Additional soil investigation was continued by International Technology. <br /> Note: PHSIEHD maintained that additional soil investigation was necessary <br /> in the basement area to define the extent of soil contamination evidenced. <br /> Six soil borings were drilled and sampled with grab groundwater samples <br /> also collected for analysis: SB1 - SB6. See the attached summary of soil <br /> sample analytical results, groundwater sample analytical results and boring <br /> logs. <br />