345 North San Joaquin Chronology <br /> Page 2 k <br /> 11/10/93 Three underground storage tanks were removed and subsequently replaced <br /> with an upgraded tank. Soil excavation of contaminated soil was initiated <br /> and confirmation soil samples collected through November 18, 1993. See <br /> the attached summary of soil sample analytical results. <br /> ~ 1994 <br /> 07/08/94 After numerous attempts, three soil borings, VW 1 - VW3, were drilled and <br /> sampled to determine the extent of soil contamination evidenced in the <br /> basement area, associated with the two underground storage tanks which <br /> were closed in-place. See the previous summary of basement soil sample <br /> analytical results. <br /> 07/27/94 Two confirmation soil borings were drilled and converted into vapor <br /> extraction/bioventing wells (VW.A - VWB), to be used should soil <br /> contamination prove to pose a threat to groundwater.. See the attached <br /> summary of confirmatory sidewalk soil sample analytical results. <br /> 1995 - 1996 <br /> Closure/site certification evaluation was initiated. <br /> Attachments <br /> Soil <br /> Basement area <br /> Summary of basement soil sample results: 1990 and 1994 <br /> Maps of basement soil sample results <br /> Monitoring wells <br /> Soil results from the installation of monitoring wells, MW1 ,- MW3. <br /> Boring logs for MW 1 - MW3 <br /> Sidewalk area <br /> Soil results from soil borings 1993 and 1994 and from the excavation <br /> Boring logs for S61 - SB6 and VWA - VWB <br /> Maps from soil borings and excavation <br /> Cross-sections <br /> Water <br /> Groundwater results <br /> i <br />