My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013309
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
9091
>
2600 - Land Use Program
>
GP-88-12
>
SU0013309
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:59:08 PM
Creation date
5/19/2020 12:50:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013309
PE
2600
FACILITY_NAME
GP-88-12
STREET_NUMBER
9091
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95206-
APN
20102001
ENTERED_DATE
5/19/2020 12:00:00 AM
SITE_LOCATION
9091 S HWY 99
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE V1 <br /> LEVEL OF SERVICE SUMMARY <br /> FOR CUMULATIVE TRAFFIC <br /> (UNMITIGATED) <br /> NORTH/SOUTH ST EASTMEST ST YQ LOS <br /> Airport Way Arch Airport Road 4.29 F <br /> East Frontage Road Arch Road 4.19 F <br /> Frontage Road Hwy 99 NB Off 4.16 F <br /> Frontage Road Hwy 99 SB Off 2.41 F <br /> West Frontage Road Arch Road 5.23 F <br /> West Frontage Road Project Access N/A <br /> Source: TJKM <br /> February 1988 <br /> The existing street system is not adequate to handle the projected cumulative traffic <br /> volumes for the year 2000. This street system will need to have major improvements <br /> to several locations or intersections, which will be defined in the Mitigations section of <br /> this report. As can be seen from Table VI, all locations would be in the failure mode, <br /> and based upon the extremely high V/C ratios, extensive mitigation measures would <br /> be required to bring the intersections back to an acceptable level of service. <br /> The project traffic was added to this cumulative scenario, and the resulting V/C ratios <br /> are reported in Table VII which follows. <br /> TABLE VII <br /> LEVEL OF SERVICE SUMMARY <br /> FOR CUMULATIVE + PROJECT TRAFFIC <br /> (UNMITIGATED) <br /> NORTH/SOUTH ST EAST/WEST ST VAC LOS <br /> Airport Way Arch Airport Road 4.34 F <br /> East Frontage Road Arch Road 4.23 F <br /> Frontage Road Hwy 99 NB Off 4.21 F <br /> Frontage Road Hwy 99 SB Off 2.51 F <br /> West Frontage Road Arch Road 5.35 F <br /> West Frontage Road Project Access 0.53 A <br /> Source: TJKM <br /> February 1988 <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.