Laserfiche WebLink
is added to engines and components and shipped with the <br /> end product . The used oil is sent to a waste oil recycle <br /> facility. <br /> 188 Octane Aviation Fuel - 1888 gals. in above ground <br /> portable storage tank - This fuel is consumed during the . <br /> testing of jet engines. This tank is kept empty until an <br /> , engine is ready to be tested. The tank is then filled <br /> . ' <br /> ' with the amount of fuel required for that test . Thus far <br /> we average two engine tests per year .. ; , <br /> a. e . Possible noise emissions (Cnel measurement) at property <br /> lines of both the 18 acre area and the 75 acre parcel ? <br /> At our present facility there are no noise emissions. At <br /> the proposed Stockton site , the only noise would be <br /> generated by taxiing jet and turboprop aircraft . I do not <br /> know what level of noise is generated by a taxiing <br /> aircraft . The Stockton airport managers office would <br /> probably have an idea of this measurement . Our testing of <br /> jet engines will take place in an enclosed sound baffled <br /> test cell . The noise generated by the testing of engines <br /> would not be heard outside of the test facility. <br /> It would appear that Aero Turbine will be installing and <br /> operation our own waste facility as no other waste <br /> facilities seem to be available at the present time . <br /> f . Proposed methods of drainage , taking into account the <br /> sizing limitations of Weber Creek and the inability to <br /> use ponds? <br /> This question shall be answered by the engineering firm <br /> of Quartaroli and Associates. <br /> g. How much area may be used for outdoor storage , and what <br /> may be stored outdoors? <br /> Outdoor storage would consist of two types. The first <br /> would be for the parking of various aircraft . This area <br /> would take approximately two acres. The second would be <br /> for the storage of engines in steel shipping containers, <br /> and the storage of ground support equipment such as: <br /> maintenance stands, and power carts. This would take <br /> approximately 28 , 888 square feet . <br /> h . Proposed hours of operation , number of employees, and <br /> size of parking lot? <br /> Our normal operating hours are from 7:88 AM to 6:88 PM, <br /> Monday through Saturaday. We currently employ <br /> approximately 58 people . It is estimated that with this <br /> new facility the number would gradually increase to 258 <br /> people . The parking lot would be large enough to handle <br />