Laserfiche WebLink
SECTION 6 <br /> SITE-SPECIFIC HEALTH AND SAFETY PLAN <br /> This section describes the potential health and safety hazards and <br /> appropriate procedures to be followed to prevent injury or chemical <br /> exposure during the RI activities. This section is organized as follows: <br /> • Key health and safety compliance personnel; <br /> • Training and documentation requirements; <br /> • Chemical hazards; <br /> • Physical hazards; <br /> • Exposure monitoring; <br /> • Work zones and decontamination procedures; <br /> • General safety rules; <br /> • First-aid procedures; and <br /> • Emergency references. <br /> Key Health and Safety Compliance Personnel <br /> Implementation of the requirements contained in this Health and <br /> Safety Plan (HSP) is the responsibility of the following key personnel: <br /> Project Manager: William A. Spong <br /> Site Health and Safety Officer: David Betts <br /> Health and Safety Director: Steve Meyers, CIH <br /> Project Manager <br /> The ERM Project Manager (PM), William Spong, has the primary <br /> responsibility for ensuring the overall health and safety of all project <br /> personnel. The PM, therefore, has the primary responsibility for <br /> 6-1 <br />