My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FYFFE
>
305
>
2900 - Site Mitigation Program
>
PR0182171
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2020 1:51:33 PM
Creation date
5/19/2020 1:44:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0182171
PE
2954
FACILITY_ID
FA0004080
FACILITY_NAME
NAVCOMSTA
STREET_NUMBER
305
Direction
W
STREET_NAME
FYFFE
STREET_TYPE
ST
City
STOCKTON
Zip
952035000
CURRENT_STATUS
01
SITE_LOCATION
305 W FYFFE ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 6 <br /> SITE-SPECIFIC HEALTH AND SAFETY PLAN <br /> This section describes the potential health and safety hazards and <br /> appropriate procedures to be followed to prevent injury or chemical <br /> exposure during the RI activities. This section is organized as follows: <br /> • Key health and safety compliance personnel; <br /> • Training and documentation requirements; <br /> • Chemical hazards; <br /> • Physical hazards; <br /> • Exposure monitoring; <br /> • Work zones and decontamination procedures; <br /> • General safety rules; <br /> • First-aid procedures; and <br /> • Emergency references. <br /> Key Health and Safety Compliance Personnel <br /> Implementation of the requirements contained in this Health and <br /> Safety Plan (HSP) is the responsibility of the following key personnel: <br /> Project Manager: William A. Spong <br /> Site Health and Safety Officer: David Betts <br /> Health and Safety Director: Steve Meyers, CIH <br /> Project Manager <br /> The ERM Project Manager (PM), William Spong, has the primary <br /> responsibility for ensuring the overall health and safety of all project <br /> personnel. The PM, therefore, has the primary responsibility for <br /> 6-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.