Laserfiche WebLink
-5- <br /> b. Decontamination protocols <br /> Decontamination procedures for PPE levels B through 0 are documented <br /> in the ERM-West Group Health and Safety Manual . These procedures are <br /> included in the attachment to this letter. ERM-'gest does not at this <br /> time envision involvement with projects requiring Level A protection. <br /> c. Drill rig cleaning <br /> ERM-West neither o-:ins nor operates drilling equipment. However, their <br /> drilling subcontractors are instructed to thoroughly steam clean their <br /> drill rigs on site in the contamination reduction zone. The cleaning <br /> is supervised by ERM-West personnel . <br /> d. Proper sanitation <br /> NAVC014MSTA Stockton has agreed to allow ERM-West personnel to use <br /> sanitation in the buildings at the base. Therefore, portable sanitation <br /> facilities are not required. <br /> Mr. Lovell also suggested that in the future, the Navy should assure that <br /> Contractors include any initial information available on levels of <br /> contaminants i-n project Health and Safety Plans. This will allow the <br /> regulatory agency's industrial hygienist to more easily follow the <br /> Contractor's rationale in choosing personal protective equipment, <br /> establishing work zones, and determining proper decontamination procedures. <br />