My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FYFFE
>
305
>
2900 - Site Mitigation Program
>
PR0009011
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2020 3:01:33 PM
Creation date
5/19/2020 1:47:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009011
PE
2954
FACILITY_ID
FA0004080
FACILITY_NAME
NAVCOMSTA
STREET_NUMBER
305
Direction
W
STREET_NAME
FYFFE
STREET_TYPE
ST
City
STOCKTON
Zip
952035000
CURRENT_STATUS
01
SITE_LOCATION
305 W FYFFE ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
276
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> StPt7 9 - Tank Changes <br /> This is the last step in the decontamination procedure <br /> for those workers wishing to change air tanks and <br /> return to the exclusion zone . The worker' s air tank is <br /> exchanged , new outer glove and boot covers are donned , <br /> and the joints are taped . <br /> Needed Equipment : Air tanks , tape , boot covers , and <br /> Step 10 - Removal of Safety Boots <br /> Remove safety boots and deposit in container with a <br /> plastic liner. <br /> Needed Equipment: Container ( thirty to fifty gallons) , <br /> plastic liners, boot jacket, and bench or stool. <br /> Step 11 - SCBA Backpack Removal <br /> Without removing face piece , the SCBA backpack should <br /> be removed and placed on a table . The face piece <br /> should then be disconnected from the remaining SCBA <br /> unit and the personnel should then proceed to the next <br /> Step. <br /> Needed Equipment: Table <br /> Step 12 - Splash Suit Removal <br /> With care , remove splash suit . The exterior of the <br /> splash suit should not come in contact with any inner <br /> layers of clothing. <br /> Needed Equipment: Container .( thirty to fifty gallons) , <br /> plastic liners, and bench or stool . <br /> Step 13 - Inner Glove Wash <br /> The inner gloves should be washed with a mild decontam- <br /> ination solution (detergent/water) . <br /> Needed Equipment : Decontamination solution (deter- <br /> gent/water solution) , basin or bucket, and table. <br />
The URL can be used to link to this page
Your browser does not support the video tag.