Laserfiche WebLink
Al Jesena 2 <br /> OWS Bldgs. 508 & 617 <br /> NCTS, Stockton <br /> 4. The Field Schedule shows the preparation of a Remedial Investigation Report to follow <br /> Phase 3 groundwater sampling. Text of the document does not include this information. <br /> Please ensure that all aspects.of the scope of work for this project are described in text for <br /> clarification. <br /> 5. A quarterly monitoring schedule should be initiated to ensure all constituents are monitored <br /> in groundwater until it has been determined that no further monitoring is necessary. <br /> The Navy should address these comments by 1 February 2000 in a Final Work Plan. If you <br /> have any questions, please contact me at (916) 255-3078 or schwabk(a�rb5s.swrcb.ca.gov. <br /> 4��K <br /> KIM A. SCHWAB <br /> Associate Engineering Geologist <br /> cc: Gail Qatsha, NCTS, Stockton <br /> San Joaquin County Environmental Health Department, Stockton <br /> Jeffrey C. Morris, CH2MHil1, 2485 Natomas Park Drive, Suite 600, Sacramento, CA <br /> 95833-2937 <br />