My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FYFFE
>
305
>
2900 - Site Mitigation Program
>
PR0009011
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2020 3:01:33 PM
Creation date
5/19/2020 1:47:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009011
PE
2954
FACILITY_ID
FA0004080
FACILITY_NAME
NAVCOMSTA
STREET_NUMBER
305
Direction
W
STREET_NAME
FYFFE
STREET_TYPE
ST
City
STOCKTON
Zip
952035000
CURRENT_STATUS
01
SITE_LOCATION
305 W FYFFE ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
276
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT <br /> ., <br /> NAVAL COMPUTER AND TELECOMMUNICATIONS STATION <br /> SAN DIEGO DETACHMENT STOCKTON <br /> RESTORATION ADVISORY BOARD MEETING <br /> AGENDA <br /> @ Building 317A(the former Armed Forces Reserve Center) <br /> Thursday, 10 February 2000 <br /> Time Topics To Be Discussed <br /> 6:00 to 6:10 p.m. Address Previous Action Items (Brad Beeman, Navy) <br /> • Finalize meeting minutes of 18 November 1999 <br /> 6:10 to 6:50 p.m. Synopsis of the Draft RI Report for Operable Unit 1 consisting of <br /> 21 Non-Landfill Sites (Dottie Lofstrom, Tetra Tech EMI) <br /> 6:50 to 7:00 p.m. Synopsis of the Remedial Project Manager Meetings (12/6/99 & <br /> 1/19/00)since the November RAB Meeting (James Austreng, <br /> Department of Toxic Substances Control and Kim Schwab, Regional <br /> Water Quality Control Board) <br /> 7:00 to 7:10 p.m. Status of Fieldwork/investigation <br /> • Pistol Range Investigation (Brad Beeman) <br /> • Site 19 Cleanup Activities(Brad Beeman) <br /> • Confirmation Sampling of the Drainage Channels (Lang Huey, <br /> Navy) <br /> • Cleanup of DDT-Contaminated Soil (Lang Huey) <br /> 7:10 to 7:20 p.m. Status of the Transfer(John Verkerk, Navy) <br /> 7:20—7:55 p.m. Open Discussion <br /> 7:55—8:00 p.m. Review New Action Items (Brad Beeman) <br /> • Review Action Items <br /> • Schedule next RAB meeting <br /> Tentative Meeting Date: Thursday, 11 May 2000 <br /> Enclosure (2) <br />
The URL can be used to link to this page
Your browser does not support the video tag.