Laserfiche WebLink
RECE VED <br /> SWRCB, January 2002 Page 1 of 1 <br /> 5 , SECONDARY PIPE TESTING <br /> Test Method Developed By : Piping Manufacturer Industry Standard <br /> Pd, <br /> sgtlrleti• <br /> i <br /> Other (Specify) <br /> Test Method Used By : W Pressure ( Vacuum Hydrostatic <br /> Other (Specify) <br /> Test Equipment Used: gauge Equipment Resolution : .20 <br /> (Tank TI : - RUL) STP (Tank T2: - PUL) STP (Tank T3 : - Diesel) STP <br /> Containment 1 to 1/2, Containment 1 to 1 /2, Containment 1 to 5/6, <br /> 3/45 5/63 7/8 3/4, 5/6, 7/8 7/8 <br /> Piping Material : dw fiberglass dw fiberglass dw fiberglass <br /> Piping Manufacturer: smith smith smith <br /> Piping Diameter: 3 in. 3 in. 3 in. in. <br /> Length of Piping Run : 120 ft. 120 ft. 120 ft. ft. <br /> Product Stored : RUL PUL Diesel <br /> Method and location of <br /> P p g- <br /> i in run isolation : sump sump sump <br /> Wait time between applying <br /> pressure/vacuum/water and 15 min 15 min 15 min min <br /> starting test: <br /> Test Start Time: 09:48 :00 09:48:00 09:48:00 <br /> Initial Reading (RI): 5.00000 PSI 5.00000 PSI 5. 00000 PSI <br /> Test End Time : 10:48:00 10:48:00 10:48:00 <br /> Final Reading (RF): 5.00000 PSI 5.00000 PSI 5. 00000 PSI <br /> Test Duration : 1 IV I hr 1 hr <br /> Change in Reading (RF-RI): 0.00000 PSI 0.00000 PSI 0.00000 PSI <br /> Pass/Fail Threshold or +/- 0.00000 +/- 0.00000 +/- 0.00000 +/- <br /> Criteria: <br /> Test Result: Pass Pass Pass <br /> Comments - (inchide information on repairs made prior to testing, and recon? niended follotiv-tip for failed tests) <br /> WO : 2346068 <br />