My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2021 2:12:42 PM
Creation date
5/19/2020 3:05:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECE VED <br /> SWRCB, January 2002 Page 1 of 1 <br /> 5 , SECONDARY PIPE TESTING <br /> Test Method Developed By : Piping Manufacturer Industry Standard <br /> Pd, <br /> sgtlrleti• <br /> i <br /> Other (Specify) <br /> Test Method Used By : W Pressure ( Vacuum Hydrostatic <br /> Other (Specify) <br /> Test Equipment Used: gauge Equipment Resolution : .20 <br /> (Tank TI : - RUL) STP (Tank T2: - PUL) STP (Tank T3 : - Diesel) STP <br /> Containment 1 to 1/2, Containment 1 to 1 /2, Containment 1 to 5/6, <br /> 3/45 5/63 7/8 3/4, 5/6, 7/8 7/8 <br /> Piping Material : dw fiberglass dw fiberglass dw fiberglass <br /> Piping Manufacturer: smith smith smith <br /> Piping Diameter: 3 in. 3 in. 3 in. in. <br /> Length of Piping Run : 120 ft. 120 ft. 120 ft. ft. <br /> Product Stored : RUL PUL Diesel <br /> Method and location of <br /> P p g- <br /> i in run isolation : sump sump sump <br /> Wait time between applying <br /> pressure/vacuum/water and 15 min 15 min 15 min min <br /> starting test: <br /> Test Start Time: 09:48 :00 09:48:00 09:48:00 <br /> Initial Reading (RI): 5.00000 PSI 5.00000 PSI 5. 00000 PSI <br /> Test End Time : 10:48:00 10:48:00 10:48:00 <br /> Final Reading (RF): 5.00000 PSI 5.00000 PSI 5. 00000 PSI <br /> Test Duration : 1 IV I hr 1 hr <br /> Change in Reading (RF-RI): 0.00000 PSI 0.00000 PSI 0.00000 PSI <br /> Pass/Fail Threshold or +/- 0.00000 +/- 0.00000 +/- 0.00000 +/- <br /> Criteria: <br /> Test Result: Pass Pass Pass <br /> Comments - (inchide information on repairs made prior to testing, and recon? niended follotiv-tip for failed tests) <br /> WO : 2346068 <br />
The URL can be used to link to this page
Your browser does not support the video tag.