My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2021 2:12:42 PM
Creation date
5/19/2020 3:05:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 Page 1 of 1 <br /> 6 . PIPING SUMP TESTING <br /> Test Method Developed By : Tank Manufacturer Industry Standard Professional Engineer <br /> Other (Specify) <br /> Test Method Used By : Pressure VacuumHydrostatic <br /> Other (Specify) <br /> Test Equipment Used : LAKE TEST Equipment Resolution : 0.0625 in. <br /> STP Containment for STP Containment for STP Containment for <br /> Tank T 1 : RUL - I Tank T2 : PUL " 1 Tank T3 : Diesel - 1 <br /> Sump Diameter/Dimensions : 48 in. 48 in. 48 in. in. <br /> Sump Depth : 59.00 in. 59.00 in. 59.00 in. <br /> Sump Material: Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 12.00 12.00 12.00 <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 7.00 7.00 7.00 <br /> Electrical Penetration : <br /> Condition of sump prior to testing : good good good <br /> Portion of Sump Tested ' 32 32 32 <br /> Does turbine shut down when <br /> sump sensor detects liquid (both r+ Yes r No r NA r+ Yes r; Nor NA r* Yes r No r" NA r" Yes r No r NA <br /> product and water)? * <br /> Turbine shutdown response time 02:00 :00 sec 02: 00 :00 sec 02 :00 :00 sec sec <br /> Is system programmed for fail-safe (; Yes r~ No r" NA r: Yes r No r NA ro Yes r No r NA r Yes r Nor NA <br /> shutdown? * <br /> Was fail-safe verified to be r; yes r~ No r NA r* Yes r No f NA C+ Yes r No r NA r Yes r"` No C NA <br /> operational? * <br /> Wait time between applying <br /> pressure/vacuum/water and starting 15 min 15 min 15 min nun <br /> test <br /> Test Start Time : 09:36:00 10:49:00 11 :56:00 <br /> Initial Reading (RI): 32.00000 in. 32.00000 in. 32.00000 in. <br /> Test End Time: 10:36:00 11 :49:00 12:56:00 <br /> Final Reading (RF): 32.00000 in. 32.00000 in. 32.00000 in. <br /> Test Duration : 1 hr 1 hr 1 hr <br /> Change in Reading (RF RI) : 0.00000 in. 0.00000 in. 0.00000 in. <br /> Pass/Fail Threshold or Criteria: +/- 0. 12500 +/- 0. 12500 +/- 0. 12500 +/- <br /> TeAResult: Pass Pass Pass , <br /> Was sensor removed for testing? C+ Yes r No f NA C• Yes r No r NA r* Yes r No r" NA r Yes r" No r NA <br /> Was sensor properly replaced and r; Yes r No r" NA r: Yes r" No r NA r* Yes r" No r NA r" Yes r" No r INA <br /> verified functional after testing? <br /> Comments - (include information on repairs made prior to testing, and recot)inaended folloiv-up for failed tests) <br /> ' If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk (* ) is "NO " or "NA" , the entire sump must be tested. <br /> WO : 2346068 <br />
The URL can be used to link to this page
Your browser does not support the video tag.