My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FYFFE
>
305
>
2900 - Site Mitigation Program
>
PR0505342
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2020 8:36:07 AM
Creation date
5/20/2020 8:30:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0505342
PE
2960
FACILITY_ID
FA0006725
FACILITY_NAME
NAVAL COMMUNICATION SYSTEM
STREET_NUMBER
305
Direction
W
STREET_NAME
FYFFE
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
305 W FYFFE ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Clayton <br /> ENVIRONMENTAL <br /> CONSULTANTS <br /> Soil samples selected for laboratory analysis are left in the brass liners, sealed with aluminum foil <br /> and plastic caps, taped for air tightness, labeled, and immediately placed into a pre-cooled ice <br /> chest chilled to less than 4°C. Labels contain the following information: site name, date and time <br /> sampled, borehole number and depth, and the sampler's initials. The samples are transported <br /> under chain-of-custody to a state-certified laboratory. The laboratory analyzes soil samples within <br /> the prescribed holding time, storing them at temperatures below 4°C at all times. <br /> Pending results of laboratory analysis, excess drilling and sampling cuttings are placed into <br /> Department of Transportation (DOT)-approved drums, labeled with the name of the site, address, <br /> and well number, and left at the site. Uncontaminated soil may be disposed of by the client. Soil <br /> found to contain levels of contaminants above local or state action levels will require that the <br /> client dispose of it in accordance with hazardous waste regulations. At the client's request, we <br /> will assist with the disposal of contaminated soil. <br /> WELL CONSTRUCTION <br /> Boreholes are converted to monitoring wells by placing 2-inch or 4-inch diameter well casing with <br /> flush-threaded joints and slotted screen into the borehole. Construction materials include <br /> polyvinyl chloride (PVC), stainless steel, or low carbon steel. The most suitable material for a <br /> particular installation will depend on the parameters to be monitored. All screens and casings <br /> used are in a contaminant-free condition when placed in the ground. No thread lubrication is <br /> used, other than teflon tape, for connecting the casing segments. <br /> Wells extend at least 10 feet into the upper saturated zone, but do not extend through any clay <br /> layers greater than 5 feet that are below the shallow water table. The standard practice for wells <br /> installed at hydrocarbon contamination sites is to construct a well with a 20-foot long perforated <br /> interval extending 15 feet below and 5 feet above the water table in an unconfined aquifer. The <br /> top of the well is solid casing. The annular space of the borehole is backfilled with washed, kiln- <br /> dried sand to a point at least 1 foot above the slotted screen. A seal above the filter pack is <br /> formed by placing a 1- to 2-foot layer of bentonite pellets on top of the sand. The bentonite <br /> pellets are moistened by pouring clean tap water down the hole so that they can expand and seal <br /> the annulus. A neat cement grout is placed above the bentonite seal and brought to the ground <br /> surface. <br /> Well casings are protected from surface contamination, accidental damage, and unauthorized entry <br /> or tampering with water-tight locking caps on the well casings. The caps are usually surrounded <br /> by a concrete vault. Wells are clearly identified with a metal tag or other device where the <br /> following information is recorded: well number, depth to water, depth of well, casing data <br /> including location of screened interval. <br /> WELL DEVELOPMENT <br /> The well seal in newly developed wells must set up for 48 to 72 hours prior to development. <br /> Since development of the well can volatilize contaminants present, the well must also settle for at <br /> least 48 to 72 hours between development and the first purging/sampling incident. <br /> All monitoring wells are initially developed to clean the well and stabilize sand, gravel, and <br /> disturbed aquifer materials around the screened internal perforations. Wells are developed by <br /> protocol.rep 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.