Laserfiche WebLink
ameO <br /> analytical results will be received 1 week after completion of field activities. Based on the initial <br /> groundwater results, a second sampling event may be conducted to assess the lateral extent <br /> of soil or groundwater. This would take approximately 4 weeks to coordinate and complete. <br /> AMEC will prepare and submit the report within 6 weeks of receipt of final analytical results. <br /> 7.0 REFERENCES <br /> AMEC Geomatrix, Inc., 2010, Investigation Report, TAOC 6`h Street Tracy Rail Yard, Tracy, <br /> California, July 30. <br /> ARCADIS, 2008, Phase II Remedial Site Investigation Report (Phase II RSI), Union Pacific <br /> Railroad — Former Tracy Railyard, Tracy, California, October 6. <br /> Geomatrix Consultants, Inc. (Geomatrix), 2005, Technical Approach to Site Evaluation and <br /> Decision-Making, Historical Pipeline Portfolio, Central Valley Region, February. <br /> Geomatrix, 2006, Downgradient Groundwater Investigation Report, TAOC Tracy Pump <br /> Station, Tracy, California, March 23. <br /> Kennedy/Jenks Consultants, 2006, DRAFT Phase I Remedial Investigation Report, Former <br /> Tracy Railyard, Tracy, California, April 26. <br /> AMEC Geomatrix, Inc. <br /> X:\16000s\161130\4000\OffSiteEastWP061511\1 W,cvrs,Itrs\text.docx 7 <br />