My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SIXTH
>
11
>
2900 - Site Mitigation Program
>
PR0523598
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2020 11:05:11 AM
Creation date
5/20/2020 10:03:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0523598
PE
2960
FACILITY_ID
FA0015928
FACILITY_NAME
TAOC 6TH ST TRACY RAILYARD (BOWTIE)
STREET_NUMBER
11
Direction
W
STREET_NAME
SIXTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23515016
CURRENT_STATUS
01
SITE_LOCATION
11 W SIXTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br /> analytical results will be received 1 week after completion of field activities. Based on the initial <br /> groundwater results, a second sampling event may be conducted to assess the lateral extent <br /> of soil or groundwater. This would take approximately 4 weeks to coordinate and complete. <br /> AMEC will prepare and submit the report within 6 weeks of receipt of final analytical results. <br /> 7.0 REFERENCES <br /> AMEC Geomatrix, Inc., 2010, Investigation Report, TAOC 6`h Street Tracy Rail Yard, Tracy, <br /> California, July 30. <br /> ARCADIS, 2008, Phase II Remedial Site Investigation Report (Phase II RSI), Union Pacific <br /> Railroad — Former Tracy Railyard, Tracy, California, October 6. <br /> Geomatrix Consultants, Inc. (Geomatrix), 2005, Technical Approach to Site Evaluation and <br /> Decision-Making, Historical Pipeline Portfolio, Central Valley Region, February. <br /> Geomatrix, 2006, Downgradient Groundwater Investigation Report, TAOC Tracy Pump <br /> Station, Tracy, California, March 23. <br /> Kennedy/Jenks Consultants, 2006, DRAFT Phase I Remedial Investigation Report, Former <br /> Tracy Railyard, Tracy, California, April 26. <br /> AMEC Geomatrix, Inc. <br /> X:\16000s\161130\4000\OffSiteEastWP061511\1 W,cvrs,Itrs\text.docx 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.