My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SCOTTS
>
908
>
2900 - Site Mitigation Program
>
PR0536958
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2020 12:15:40 PM
Creation date
5/20/2020 11:07:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0536958
PE
2950
FACILITY_ID
FA0021221
FACILITY_NAME
SCOTT AURORA INC
STREET_NUMBER
908
Direction
E
STREET_NAME
SCOTTS
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
15130001
CURRENT_STATUS
01
SITE_LOCATION
908 E SCOTTS AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Limited Subsurface Investigatioâ–º, Work Plan 0 <br /> 908 East Scotts Avenue <br /> Stockton,California a n to a g ro u p <br /> Antea Group Project No. UPR82572 <br /> 3.2.3 Investigation-Derived Waste <br /> The licensed driller will store all soil cuttings and decontamination water generated during the investigation <br /> activities in Department of Transportation (DOT) approved 55-gallon drums,in accordance with the corresponding <br /> DOT protocols for non-hazardous waste. Antea Group will label and inventory all drums temporarily stored on- <br /> site, pending analysis and characterization. Antea Group will submit samples of the soil cuttings to a state-certified <br /> laboratory, requesting analyses for all contaminants of concern necessary for waste characterization. Upon receipt <br /> of the analytical results, United Pumping Services will characterize the waste and transport and dispose of it at a <br /> licensed disposal facility. <br /> 3.2.4 Reporting <br /> Upon approval of this Limited Subsurface Investigation Work Plan, Antea Group will complete pre-field activities, <br /> including permitting,access, and scheduling the field sampling event. Antea Group anticipates the utility clearance <br /> and GPR activities will take one day,followed by the soil sampling(two days) a minimum 48 hours after contacting <br /> USA North for utility clearance. After receipt of the soil analytical data, Antea Group will submit a report <br /> summarizing the field activities and results. A California Professional Geologist will oversee the activities outlined <br /> in this work plan and will oversee the preparation of corresponding technical reports. <br /> 4 www.anteagroup.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.