My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0076378
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
12348
>
4200/4300 - Liquid Waste/Water Well Permits
>
SR0076378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:58:32 PM
Creation date
5/20/2020 2:32:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200/4300 - Liquid Waste/Water Well Permits
RECORD_ID
SR0076378
PE
4201
FACILITY_ID
FA0000332
FACILITY_NAME
VILLA CEREZOS
STREET_NUMBER
12348
Direction
N
STREET_NAME
STATE ROUTE 99
City
LODI
Zip
95240
APN
06108016
ENTERED_DATE
12/6/2016 12:00:00 AM
SITE_LOCATION
12348 N HWY 99
P_DISTRICT
004
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
require the manual cleaning of the pipe and flow meter to allow for proper recording of the <br /> effluent flows. The quality of the effluent flow from the treatment plant is also a concern that <br /> the life of the dry wells could be decreased due to the increased suspended solids that are <br /> being put into the wells. From the flow data that has been recorded for the treatment plant an <br /> average daily flow of 7,167gpd will be used for the design of the package wastewater plant. <br /> Based upon the number of units in the mobile park (75 units), the average daily flow per unit is <br /> 96 gal/day/unit. To further compare this data with another mobile park, the flow data from <br /> West Lane Mobile Park wastewater plant was obtained. The West Lane Mobile Home Park <br /> consists of 85 units of which 75 are currently filled with double wide units. Flow data was <br /> obtained (Attachment H) from August 1, 2016 thru October 31, 2016 for a total of 585,829 <br /> gallons over a period of 92 days. The average daily flow for the park is 6,367 gallons which is 85 <br /> gal/day/unit. The plant operator has stated that this flow has been consists since the package <br /> plant had been installed. <br /> Proposed Package Plant Description <br /> The wastewater treatment process to be used for this project will be the "Extended Aeration" <br /> type process. The package plant will be provided by Pollution Control Systems, Inc. (PCS). In <br /> the PCS system, the sewage is purified by the destruction of the organic compounds by using <br /> aeration to oxidize the volatile material into gas, water and sludge. Continued aeration of <br /> highly concentrated solids produces additional organisms that break down their own and other <br /> dead cell matter into water, carbon dioxide and ash. The resulting effluent is clear and <br /> odorless. Generally PCS treatment plants will remove approximately 85% to 90% of the BODS <br /> and Suspended Solids. Additional treatment is provided with an anoxic process to reduce <br /> nitrogen. <br /> Package Plant Equipment Specifications <br /> For the purpose of design an average daily flow of 9,OOOgpd will be used. Additional sizing <br /> safety factors will be provided for the actual plant size. The following is the equipment <br /> specifications for this package plant. <br /> General Specifications: <br /> Equalization Chamber Volume 4,350 gallons <br /> Sludge Holding Chamber Volume 2,975 gallons <br /> Anoxic Chamber Volume 3,500 gallons <br /> Aeration Chamber Volume 13,125 gallons <br /> Clarifier Chamber Volume 2,285 gallons <br /> Chlorine Contact Chamber Volume 374 gallons <br /> Page 3 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.