Laserfiche WebLink
Item No. 4 <br /> PC: 10-1-92 <br /> UP-92-27 <br /> Page 2 <br /> STAFF ANALYSIS <br /> BACKGROUND: <br /> On March 28, 1990, the Planning Division approved Site Approval Application No. SA-90-38, which <br /> permitted a wholesale nursery (Stewarts Nursery) to be established at this site. <br /> POLICY CONSIDERATIONS: <br /> General Plan and Zoning: <br /> This Use Permit is being processed pursuant to the 1995 General Plan and Planning Title. The <br /> site is designated Limited Industrial on the General Plan. The zone is M-1 (Limited <br /> Manufacturing). Trucking terminals may be conditionally permitted in the M-1 zone with a Use <br /> Permit- <br /> AREA/NEIGHBORHOOD <br /> ermitAREA/NEIGHBORHOOD COMPATIBILITY: <br /> Land Use: <br /> Tapley Pool is located to the west of this site across Harlan Road. Across Roth Road to the south <br /> is a vacant lot, two residential lots, and a feed supplement manufacturer. East of the site is the <br /> Southern Pacific Railroad. North of the site is the Lighthouse Village Mission and a residence. <br /> This proposal may conflict with the residential use of the one-acre parcel located on the northwest <br /> corner of this project The applicant has designed his parking area to minimize the impact to the <br /> residence. Staff is recommending that a six-foot-high masonry wall be erected as a buffer along <br /> the property line between the project and the residence. No other land use issues have been <br /> identified. <br /> Traffic/Circulation/Parking: <br /> The site has access by frontage on Harlan Road and Roth Road via one driveway on each road. <br /> The Harlan Road driveway will be used exclusively by autos, while the Roth Road driveway will <br /> be used by both trucks and autos. The gate to the truck parking area is located 140 feet from <br /> Roth Road, allowing ample room for trucks to exit the highway completely before stopping to <br /> open the gate. The applicant is proposing asphaltic concrete over rock base for all parking and <br /> maneuvering areas.-Other than the driveways, no roadway improvements are required <br /> The 56 existing auto parking spaces comply with the requirements of the Planing Title (2 per <br /> 1,000 square feet of building space [24], plus one for each employee on the busiest shift [251). <br /> It is estimated that this project will produce approximately 25 truck trips per day and 25 vehicle <br /> trips per day. As this project is limited to 25 trucks, and is located on a major arterial (minor <br /> arterial on the 1995 General Plan Map) within 200 feet of a freeway, it is unlikely that this project <br /> will have a significant impact on the level of service of the local highways. The Department of <br /> Public Works is not requiring a traffic study. <br />